Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Screw Anchors for Ground Control
By Frank Schmidt
Due to changing geology, rib bolting is an ever-changing problem in ground control. With the economic status of the coal market, the need for safely increasing productivity in rib bolting is at an all
Jan 1, 2013
-
Controlling Subsidence Effects Using Partial Backfilling
By Yingzin Zhou
Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to
Jan 1, 1990
-
Study on Environmental Management of Mining Subsidence Areas
By Weijia Guo
With the exploitation of coal resources, a large area of land had been affected by surface subsidence, causing conflicts between man and land to become more conspicuous by the day, affecting the life
Jan 1, 2006
-
Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads
By Peng Cao, Jimin Su, Yang Li
"Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai
Jan 1, 2018
-
Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China
By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren
"The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The
Jan 1, 2018
-
Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating Sensing
By Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai
"The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d
Jan 1, 2010
-
Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its Influence
By Wenbing Guo, Yi Tan, Erhu Bai
"It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn
Jan 1, 2016
-
Comparison of L-Band and X-Band Differential Interferometric Synthetic Aperture Radar for Mine Subsidence Monitoring in Central Utah
By Jessica M. Wempen, Michael K. McCarter
"Differential Interferometric Synthetic Aperture Radar (DlnSAR), a satellite-based remote sensing technique, has potential application for measuring mine subsidence on a regional scale with high spati
Jan 1, 2016
-
Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress
By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen
"Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee
Jan 1, 2010
-
Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover
By Ashok Kumar, Rajendra Singh, Petr Waclawik
High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill
Jan 1, 2018
-
Establishment and Application of Deformation Monitoring System of Roadway Based on the Three?Dimensional Model Experiment
By Yongping Wu
Roadway deformation and stress migration occur with uncertainty and randomness because of geology, tunneling and mining influence. In order to study the surrounding rock deformation and failure mechan
Jan 1, 2013
-
Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover
By David F. Gearhart
A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha
Jan 1, 2014
-
Geometrical Description of Gateroad Roof Sag
By Zbigniew Lubosik, Stanislaw Prusek
"The main elements of hard coal extraction systems in the Polish mining industry, including the characteristics of gateroads, are described, followed by several dozen underground measurements of gater
Jan 1, 2010
-
Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China
By WenFeng Li
Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We
Jan 1, 2013
-
Underground Longwall Mining with the Impact of Disturbed Areas by Abandoned Gateroads and Small Gobs
By Enguang Zhu, Kangning Zhang, Yang Li
"Due to the use of outdated mining technology or room and pillar mining process in small coal mines, the coal recovery ratio is only 10% - 25%. In many regions of China: the damage area caused by the
Jan 1, 2016
-
Application Research of 3D Laser Scanning Technology in Monitoring Subsidence Area of Coal Mining
By Feiya Xu, Syd S. Peng
"As a highly efficient and new surveying and mapping technique, 3D laser scanning technology has been gradually applied to surface subsidence monitoring in mining areas. 3D laser scanning technology w
Jan 1, 2018
-
Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCL
By Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan
"India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and
Jan 1, 2017
-
Strata Control Investigations During Fully Mechanized Coal Pillar Extraction in Indian Coalfield
By Rajendra Singh
Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 3
Jan 1, 2014
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining
By Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015
-
Influence of Mine Layout, Mining Method, and Geology on Down?Dip Coal Barrier Performance at the Solar No. 7 Mine
By Anthony T. Iannacchione
The Solar No. 7 and Solar No. 10 mines were designed to prevent mine waters from directly discharging to the surface. In January of 2004, a discharge occurred as the Solar No. 7 mine was in its final
Jan 1, 2013