  • SME
    Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021

    By Jürg Künzle

    The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m

    Jun 13, 2021

  • SME
    Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021

    By Angus Maxwell, Jacob Grasmick

    As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain

    Jun 13, 2021

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • SME
    High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021

    By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler

    In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    The Variable Density TBM—Current Level of Development - RETC2021

    By Werner Burger

    After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi

    Jun 13, 2021

  • SME
    Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021

    By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks

    The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip

    Jun 13, 2021

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021

    By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell

    Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro

    Jun 13, 2021

  • SME
    Dustless Hard Rock Tunneling Methods - RETC2021

    By Cody Giroux, Homer Scurlock, Michel Wasag

    Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive

    Jun 13, 2021

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021

    By P. Nelson, R. O’Connell, J. Rostami

    Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u

    Jun 13, 2021

  • SME
    Design and Construction of a Deep Underground Station in Urban Area - RETC2021

    By Verya Nasri

    This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i

    Jun 13, 2021

  • SME
    Methodologies for Sound Transit’s Proposed New Tunnels for LINK Light Rail Expansion - RETC2021

    By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava

    Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle currently anticipated by 2031 and Ballard by 2036. These

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021