  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Developing a best practice framework for inrush risk management

    By L Manca, P B. Hills, D Tyler, N Pollington

    This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in

    Mar 15, 2021

  • AUSIMM
    Implementation of a High Energy Dissipation Ground Support Scheme

    By E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro

    Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg

    Mar 15, 2021

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    On the flipside: why cost cutting is out; revenue maximization is in and value is always king

    By H Allday

    The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive

    Mar 15, 2021

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Collaborative development of mine ready electric vehicle

    By H Guthrie, J Hodder, J Bain, S Durkin

    Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle

    Mar 15, 2021

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021