Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-20(1)-76 Applicability Of Available Multiplex Carrier Equipment For Mine Telephone Systems - I. Executive Summary - A. Objective
By Robert L. Lagace
The purpose of the work reported herein was to investigate whether available telephone multiplexing equipment offered a means to rapidly upgrade the traffic-handling capacity of present mine telephone
Jan 1, 1975
-
Direct observation of the fayalite slag formation behaviour from large SiO2 grains
By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami
The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea
Jun 19, 2024
-
What for Copper After the War?
By W. R. Ingalls
IF, in this study of the outlook for the copper industry of the United states, I find myself assuming to be prophetic in some respects I shall express myself with hesitation and with the foresight tha
Jan 1, 1944
-
Top Submerged Lance Furnace Lining Cooling System Upgrade
By Allan MacRae
Freeport-McMoRan Inc. operates an ISASMELTTM furnace for the smelting of copper concentrate at the Miami Smelter in Claypool, Arizona. In May 2017, the furnace was restarted after incorporating newly
-
Mining Graduates and Their Problems
By Scott, Turner
MY whole life has been spent in the mining business, PO I naturally tend to address my remarks particularly to the newly-graduated mining and metallurgical engineers among you. To a certain extent, al
Jan 1, 1932
-
RI 5019 Oil-Shale Operations In The Union Of South Africa, October 1947 ? Introduction
By H. M. Thorne
The Union of South Africa has been interested in oil shale for a long time, and deposits of oil shales, torbanites, and similar rocks have been found in many parts of the country. (Fig. 1.) Samples di
Jan 1, 1954
-
Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)
By G. Miller
The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant
Jan 1, 2001
-
Thermal Exposure Limit in a Simulated Refuge Alternative
By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard
Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumedmetabolic rate of 325W, a limit that appears to be arbit
Nov 8, 2019
-
Technical Papers and Discussions - Copper and Copper-Rich Alloys - Structure of Copper-zinc Alloys Oxidized at Elevated Temperatures (Metals Technology, Sept. 1943)
By B. J. Nelson, F. N. Rhinos
Studies upon the rates of oxidation of copper alloys containing small quantities of the alloying elementsl,2 have shown that steady growth of the scales at predictable rates is limited to a small conc
Jan 1, 1944
-
Technical Papers and Discussions - Copper and Copper-Rich Alloys - Structure of Copper-zinc Alloys Oxidized at Elevated Temperatures (Metals Technology, Sept. 1943)
By F. N. Rhinos, B. J. Nelson
Studies upon the rates of oxidation of copper alloys containing small quantities of the alloying elementsl,2 have shown that steady growth of the scales at predictable rates is limited to a small conc
Jan 1, 1944
-
Prediction and performance of a WLIMS circuit through bench-scale Davis Tube testwork, R.D. Govender and A. Singh
By A. Singh, R. D. Govender
The current method employed to quantify the efficiency of separation of ferromagnetic ores by wet low intensity magnetic drum separators (WLIMS) incorporates the use of a conventional benchscale Davis
Jan 1, 2020
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine
By J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
Iron ore tailings and value addition – a short review
By G Senanayake, K Hazarika
The demand for iron-ore is ever increasing with the industry directly employing 60 500 people in a range of highly skilled roles in Australia. In the year 2019, the global iron-ore production was 2.85
Nov 8, 2021
-
Phosphate Rock Industry of Foreign Countries
By F. C. Noyes
DAME Nature was in a generous mood when she distributed widely over the face of the globe numerous deposits of phosphate rock from which man can make phosphatic festiIizer to replace the phosphate re-
Jan 1, 1944
-
A Study on Direct Oxalate Precipitation for REE Recovery from a Low-Grade REE Pregnant Solution
By W. Griffith
"While oxalic acid precipitation practices are commonly applied on purified rare earth elements (REEs) pregnant leaching solutions (PLS), few efforts have been reported using oxalic acid (OXA) to reco
Jan 1, 2016
-
The Coal Industry ? Abnormal Conditions Continue as Producers Turn Out 685 Millions Tons - Postwar Planning Not Neglected
By A. W. Gauger
DESPITE many handicaps and in the face of many discouragements anthracite and bituminous coal producers continue to supply the needs of the nation now vastly multiplied by the demands of the greatest
Jan 1, 1945
-
Coal Research in Canada, 1966
"Far from being eclipsed by petroleum and natural gas, Canadian coal continues to command wide (and apparently growing) interest.Major R & D investigations are currently heavily oriented toward coal b
Jan 1, 1967
-
Ore Pre-Concentration by Bulk Sorting Using Real Time Elemental Analysis
"Conveyed coal flows have been diverted on the basis of real time ash analysis since the 1980s. Many coarse particle separation methods are available through screens, jigs, heavy media separation, par
Jan 1, 2018
-
RI 5519 Natural Gas-Air Burner For A Top-Fired Preheater ? Summary
By R. J. Leary
The natural gas-air burner described in this report was designed and constructed to meet the thermal requirements of a convective process for heating steel scrap. This process involved downward combus
Jan 1, 1959
-
OFR-149-77 Dust Control On Auger-Type Mining Machines, Using The Wet Auger System
By G. J. Hundman
Control of respirable dust produced by auger type continuous mining machines is normally attempted by water sprays from fixed nozzles mounted on the frame of the machine. In tests conducted under this
Jan 1, 1977