Search Documents

  • CIM
    Anaconda Mining Inc.’s Point Rousse Project Cyanide Destruction System Development Study

    By Neri Roux, Chris Budgell, Allan Cramm, Leo Cheung

    "Anaconda Mining Inc. is investigating potential improvements and expansions to their operating plant located on the Baie Verte Peninsula in Newfoundland. An extensive batch and continuous bench scale

    Jan 1, 2017

  • CIM
    Hot-Water Separation of Alberta Bituminous Sand

    By K. A. Clark

    SEPARATION of the oil from the bituminons sands of the Athabaska area of Alberta has been a subject of study by the Research Council of Alberta. The results of the study have been published in the Ann

    Jan 1, 1944

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration (c1221f6a-70cf-4429-9a4d-13a3e324a05a)

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • AIME
    Transportation Of Molten Blister Copper By Rail From Smelter To Refinery

    By Frederic Benard

    PRIOR to 1936, the Ontario Refining Co. received all incoming blister copper from The International Nickel Company's smelter in the usual form of 460-lb. cakes, or slabs. These were received in o

    Jan 1, 1938

  • CIM
    Larger Tonnages, Larger Crushers? (4b90a2d7-e545-4b9a-86f4-a36122e857a0)

    By K. L. Boyd

    "Can the increasing tonnages of ore and waste mined today be accommodated simply by using bigger and better crushers? This paper reviews the latest primary crushing and large cone crusher designs. It

    Jan 1, 2017

  • AIME
    Minerals Beneficiation - Correlation of Product Size, Capacity and Power in Tumbling Mills

    By U. N. Bhrany, N. Arbiter

    Over the last one hundred years the problem of assessing the efficiency of energy consumption in producing rock breakage has been studied by many investigators from a variety of viewpoints. Their cont

    Jan 1, 1961

  • AUSIMM
    Operating Experiences with the High Pressure Gas Pipeline from Morwell to Melbourne

    The construction of the pipeline was completed in June 1956 and the line placed into operation in December 1956, ie. it has now been in continuous operation for approximately three years under an oper

    Jan 1, 1960

  • SME
    Mineralogical Examination Of Carbonates In The Crandon Tailings

    By K. P. Black, G. W. Sevick, D. E. Hockley, K. S. Sexsmith, J. T. Chapman

    Mineralogical analyses of carbonates in depyritized tailings and pyrite concentrate (from depyritization of the tailings) were completed as part of the tailings characterization for the Crandon Projec

    Jan 1, 2002

  • NIOSH
    RI 9005 - Microwave Drying of Fine Coal

    By David P. Lindroth

    The objective of this research by the Bureau of Mines was to determine the technical feasibility and associated pilot data for drying minus 1/4-in coal with microwave energy at a frequency of 2.45 GHz

    Jan 1, 1986

  • CIM
    Save Time and Money in Industrial Mineral Plant Start-ups

    By Michael G. Rulff, Tracy M. Holmes

    "Vast amounts of time and money are spent fighting flow problems in plants that involve the handling or processing of industrial minerals. Because these types of projects tend to be capitalintensive,

    Jan 1, 2008

  • AIME
  • SME
    Critical Review Of Numerical Stress Analysis Tools For Deep Coal Longwall Panels Under Strong Strata - Preprint 09-011

    By M. K. Larson

    Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element

    Jan 1, 2009

  • NIOSH
    IC 8290 Titanium Resources Of The United States

    By Edward C. Peterson

    Recent studies indicate that the United States halt substantial reserves of ilmenite, one of the major titanium minerals. However, the studies showed that sources of rutile, another important source o

    Jan 1, 1966

  • CIM
    Use of gravity drainage and quasi-homogeneous dykes for containment of oil sand tailings (df9a2317-173a-4976-8412-bf4feb957a4f)

    By L. Nichols, H. Keele, K. Czajewski

    "The oil sands industry in northern Alberta disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent, constit

    Jan 1, 2008

  • SME-ICGCM
    Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine

    By V. V. Nazimko

    Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult

    Jan 1, 1999

  • CIM
    Research, Innovation & Reality

    By Richard Burt

    "In seeking to supply the ever increasing needs for raw materials, the mining industry has been required to develop lower grade resources in increasingly remote regions of the world. This has resulted

    Jan 1, 1999

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • SAIMM
    Optimizing The Life Of Ore Passes In A Deep-Level Gold Mine

    By P. R. Brenchley

    Main ore pass systems should last the life of a mine, and too often expensive and hazardous remedial measures are required to repair a damaged ore pass in an attempt to extend its life. In order to ma

    Jan 1, 2006

  • AUSIMM
    What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?

    By D Connelly

    Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi

    Jul 13, 2015