Search Documents

  • AUSIMM
    A Cathode Headbar for Zinc Electrolysis: Developments at Risdon, 1917-1957

    By Bain J. H

    Since zinc was first deposited at Risdon in February, 1917, provision of the most economical cathode assembly has been a subject of extensive research, the major problems being corrosion and efficient

    Jan 1, 1958

  • CIM
    Stope Filling at the Sullivan and Other Canadian Mines

    By James D. Hall

    THIS essay deals with the materials and methods used in the waste filling of scopes in Canadian mines, with especial reference co the methods used at the Sullivan mine, Kimberley, B.C. The author wo

    Jan 1, 1937

  • NIOSH
    OFR-6(1)-77 The Impact Of Overmining And Undermining On The Eastern Underground Coal Reserve Base

    By Ronald W. Stingelin

    This study undertook the development and implementation of a methodology for estimating the impact of coal seam interaction on the eastern bituminous underground reserve base as published in USBM Info

    Jan 1, 1976

  • NIOSH
    RI 3679 Smelting Of Vanadium-Bearing Titaniferous Sinter In An Experimental Blast Furnace

    By S. S. Cole, C. E. Wood, T. L. Joseph

    "INTRODUCTION Iron ore containing titanium was first used in blast furnaces over a century ago. It is well known that TiO2 is a slag-forming material that will increase the amount of slag produced by

    Jan 1, 1943

  • TMS
    Toward a Basic Understanding of Injection Phenomena in the Copper C0nverter

    By J. K. Brimacombe

    Since the Peirce-Smith converter was introduced to the non-ferrous industry in the early part of this century, there has been a paucity of research on process-engineering aspects of the reactor such a

    Jan 1, 1985

  • NIOSH
    OFR-117-79 Evaluation Of Coal Mine Electrical System Safety

    By Lloyd A. Morley

    This annual report details progress under USBM Grant G0155003 during the project period of January 1, 1977 through December 31, 1977. The report contains four principal chapters covering accomplishmen

    Jan 1, 1978

  • NIOSH
    IC 8817 Minerals Health And Safety In-House Research, Development, And Demonstration In Fiscal Year 1980

    This publication summarizes, for all interested parties, the research, development, and demonstration in-house projets programed by the Bureau of Mines for fiscal year 1980 (October 1, 1979 - Septembe

    Jan 1, 1980

  • SME
    Technical Note - Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 8, 1987

  • ABM
    MÉTODOS DE DEFINIÇÃO DAS TEMPERATURAS DE TRANSFORMAÇÃO DE FASES EM LIGAS DE NiTi EQUIATÔMICA A PARTIR DE RESULTADOS DE DSC

    By Patrícia Freitas Rodrigues

    Um comparativo entre dois métodos para determinação das temperaturas de transformação de fase, tendo como base análises de Calorimetria Diferencial de Varredura (DSC) em amostras de uma liga de NiTi e

    Aug 8, 2018

  • CIM
    The Internal Shaft at Dome Mines, Limited (71fd39d6-4402-4009-838c-512c649e2c2f)

    By Charles Kingsley

    THE PRESIDENT (DR. C. B. KINGSTON, member C.l.M.M.) expressed regret that neither of the authors of the paper was able to be present to submit the paper in person. In their absence, it would be introd

    Jan 1, 1939

  • NIOSH
    OFR-130(2)-85 High Reliability Miner Hydraulic System - Volume I - Part II - Section III - G Valves - Introduction

    Operator efficiency and control capability along with cost effectiveness have been the quest of mining, industrial, and mobile hydraulic engineers for years. The majority of the functions in present d

    Jan 1, 1983

  • AUSIMM
    Cadmium in the Broken Hill Lode

    Cadmium occurs in the Broken Hill Lode essentially as a camouflaged element, substituting diadochically for zinc in the sphalerite.Analyses of a series of zinc concentrate flotation products, prepared

    Jan 1, 1955

  • NIOSH
    IC 8469 Availabilty Of U.S. Primary Nickel Resources

    By Gary A. Kingston

    Domestic nickel resources are costed to develop a contingency supply curve of U.S. nickel availability at various costs. It is estimated that 4.3 billion pounds of nickel is potentially recoverable fr

    Jan 1, 1970

  • TMS
    Arsenic Dopant Effect in Nickel Silicide Formation for NiSi/Hf-based/Si Gate Stacks

    By S. Y. Tan

    The thermal stability of fully silicided NiSi with arsenic doping on silicon was investigated. The aims of the work were to investigate the Ni silicide phase-related issues associated with arsenic dop

    Jan 1, 2010

  • AUSIMM
    Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ

    WMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchm

    Jan 1, 2000

  • AUSIMM
    The Geology of Iron Monarch Orebody

    To date Iron Monarch is the most important Australian source of iron ore and since HH5 has produced about 84 million tons of direct shipping ore containing 62 per cent iron and 3 per cent manganese.Pr

    Jan 1, 1964

  • AUSIMM
    Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria

    GENERALTHE coal deposit, where it is being worked, consists of a bed of brown coal varying in thickness from 120 ft. to 200 ft., covered by an overburden of clay, drift, loam, etc., of a thickness of

    Jan 1, 1924

  • AUSIMM
    Oceanographic Preparations for Offshore Drilling

    There is a lack of information concerning the movements of water on the continental shelf, particularly with regard to data obtained regularly over significant periods of time. The Horace Lamb Centre

    Jan 1, 1971

  • SAIMM
    An analysis of the practical and economic implications of systematic underground drilling in deep South African gold mines

    By D. G. Krige

    Using chip sample data and spatial structure parameters from a large mined-out section of a South African gold mine the advantages to be gained from a regular underground borehole drilling programme h

    Jan 1, 2003

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011