Search Documents

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • TMS
    Thermodynamic Modeling of KIVCET Lead Process

    By Pengfu Tan

    A thermodynamic model of KIVCET lead smelting process has been developed. The model has the capability to predict the distribution behaviors of Pb, Zn, Fe, S, O, As, and heat balance in KIVCET direct

    Jan 1, 2006

  • IOM3
    Practical approach to the solubility of colemanite ores

    By S. G. Ozkan

    An investigation was carried out into the effect of physical parameters, such as particle size of the sample, residence time, solid/liquid ratio and impeller speed in the flotation cell, on the solubi

    Jun 21, 1905

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • SME
    Mixed Face Tunnel Jacking with a Grillage

    By J. E. Bernick, J. Davies

    This paper describes the design and construction of a 22.86 m (75 ft) long jacked tunnel, which was successfully installed, despite difficult mixed face conditions at Metro-North’s Westport Station, i

    Jan 1, 2005

  • TMS
    Preparation Of High Purity Anhydrous Neodymium Chloride

    By Georges J. Kipouros

    Anhydrous neodymium trichlorids (NdCl3), containing ~1 weight percent neodymium oxychloride (NdOCI) was prepared by the dehydration of neodymium trichioride hexahydrate (NdC13.6H2O). Dehydration of t

    Jan 1, 1992

  • SME
    Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA‑II

    By Aijuan Zhang, Liang Zhao, Yutao Wang, Yu Bao

    In the green backfilling mining of underground coal mines, gangue in a coal seam is used to replace and fill goafs. However, the gas drainage time changes in the amount of gangue output and order in t

    May 23, 2022

  • AIME
    Shaft-Sinking at Suria, Spain - II

    By J. B. STEWART

    T HE position of each hole of any series of holes was carefully located by the surveyor, plotted in plan and elevation, and numbers assigned to them. The second series was staggered halfway between th

    Jan 1, 1926

  • NIOSH
    Statistical Summary (949586b6-b8da-4f98-ad25-eb0908adb9c2)

    This chapter summarizes data on crude mineral production for the United States, its island possessions, and the Commonwealth of Puerto Rico. Included also are tables that show the principal mineral co

    Jan 1, 1977

  • NIOSH
    RI 2272 Fourth Semi-Annual Motor Gasoline Survey

    By N. A. C. Smith

    The Bureau of Mines motor gasoline surveys have been conducted in January and July, during 1920 and 1921. The Bureau has obtained and analyzed samples of gasoline representative of that marketed in th

    Jan 1, 1921

  • SAIMM
    Mechanisms Of Large Seismic Events In Platinum Mines Of The Bushveld Complex (South Africa) ? Synopsis

    By D. Malovichko

    Seismic events and pillar failures observed in two platinum mines in the Rustenburg area, South Africa, were investigated. We studied the sources of approximately 300 largest seismic events recorded i

    Jan 1, 2012

  • SME
    Mine Rescue And Survival -First Phase

    By Barnettm Ray R.

    As a result of the Farmington explosion, the U. S. Bureau of Mines commissioned the National Academy of Engineering to a determine what steps could be taken in a short time frame to significantly red

    Jan 1, 1971

  • NIOSH
    OFR-38-86 On The Development Of A Model-Based Control Strategy For Copper-Ore Flotation

    By J. A. Herbst

    During the last decade it has been established that conventional flotation control strategies based on classical control theory result in significant increases in grade, recovery, and operating-cost s

    Jan 1, 1986

  • AUSIMM
    Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)

    RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo

    Jan 1, 2007

  • TMS
    Influence of Direct Aged Treatment on Creep Behaviors of Hot Continuous Rolling GH4169 Superalloy

    By Tian Sugui

    By direct aging treated, creep properties measurement and microstructure observation, the influences of the direct aging treatment on the creep behaviors of Hot Continuous Rolled GH4169 superalloy are

    Jan 1, 2010

  • DFI
    The Advantages Of Arbitration - I. Arbitration Defined

    By John B. Tieder

    Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir

    Jan 1, 1988

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • SAIMM
    Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability Radar

    By Glen Mc Gavigan

    The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d

    Jan 1, 2006

  • NIOSH
    OFR-140-84 Development Of Engineering And Cost Data For Foreign Gold And Silver Properties

    By Robert E. Green

    This Final Report summarizes the results of work accomplished under Contract No. J0215039. It is in an executive overview or executive summary format. The number and description of the various techni

    Jan 1, 1983

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014