Search Documents

  • IOM3
    Can blasting enhance the grindability of ores?

    By K. Nielsen, J. Kristiansen

    A series of laboratory blasting and grinding tests on three types of hard and competent rock (coarse-grained monzonite, fine-grained granite and very fine-grained gabbro) showed that a higher level of

    Dec 1, 1995

  • AUSIMM
    Seafield ResourcesÆ Offshore Alluvial Gold Project, Westland, New Zealand

    By N F. Fraser

    Seafield ResourcesÆ offshore placer gold project covers c.10 000 km2 of the Westland continental shelf between Karamea and Jacksons Head, from the low-water mark out to the 120 m isobath (Figure 1). D

    Jan 1, 2005

  • NIOSH
    RI 9124 - Device for In Situ Measurement of Coal-Cutting Forces

    By James C. Church

    The Bureau of Mines devised and demonstrated a portable linear cutting tester that directly measures and records the in situ cutting forces required of continuous-mining machine picks to it coal in un

    Jan 1, 1985

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • SAIMM
    The Influence Of Geology On A Simulated Rockburst

    By N. Reddy

    The influence of local geology and rock mass characteristics on deformations during a rockburst caused by a controlled blast was studied. This was done by means of visual examination, mapping and phot

    Jan 1, 2001

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Bending Strength Of Threaded Micropile Connections

    By Steven R. Musselman

    The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross

    Jan 1, 2007

  • IOM3
    Pechenga area, Russia - part 1: geological setting and comparison with Pasvik, Norway

    By V. A. Melezhik, P. K. Skufin, L. P. Nilsson

    these factors into account. Theoretical and

    Aug 1, 1994

  • NIOSH
    Sound Power Level Study of a Roof Bolter

    By R. J. Matetic, J. S. Peterson, P. G. Kovalchik

    The National Institute for Occupational Safety and Health (NIOSH) has initiated a study of a roof bolter to reduce noise exposure to mine roof-bolter operators. An important segment of this research e

  • NIOSH
    OFR-66(3)-76 Research And Development Program On The Disposal Of Retorted Oil Shale---Paraho Oil Shale Project - Phase IV - Interim Report No. 1 Direct Heat Retorted Shale From Semi-Works Plant ? I. Introduction ? 1. General

    A preliminary program dated April 25, 1974, was prepared for Development Engineering, Inc. (DEI) on research and development. for laboratory, field and other engineering studies on the disposal of ret

    Jan 1, 1975

  • DFI
    Specialized Slurry Wall Equipment - The Hydromill - Summary

    By Mario Mauro

    The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l

    Jan 1, 1994

  • IOM3
    Limits of explosibillity of mixtures of coal dust and methane

    By P. Golledge, A. D. S. Gillies

    An investigation has been carried on samples of three Queensland coal dusts to determine the potential explosibility of dust-gas mixtures. The explosion potential of the samples was classified by the

    Jun 19, 1905

  • AUSIMM
    Intensive Boring on the Wonthaggi Coal-Field, Victoria

    THE Wonthaggi coal-field lies south easterly from Melbourne at a distance by rail of 86 miles, on the flats of the Powlett River, immediately to the south of the deep-cut valleys and steep intervening

    Jan 1, 1918

  • AUSIMM
    University Mining Education

    Mining education has received almost continuous discussion since its inception and most people engaged in the mining industry and in mining education feel at some time the urge and necessity to expres

    Jan 1, 1959

  • SME
    Sustainable Tailings Management; Dry Stacking

    By Daniel Lakovic

    "Mining operations can create a negative environmental impact, especially when considering the tailings that are produced through the processing of ores. Tailings are finely grained residues that form

    Dec 1, 2018

  • AIME
    PART X – October 1967 – Communications - On the Characteristic Temperatures of the Martensitic Transformation in Copper-Zinc

    By R. E. Hummel, J. W. Koger

    IT is generally accepted that the martensitic start temperature (Ms) can be determined by resistivity measurements and is that temperature where the resistivity vs temperature curve on cooling first d

    Jan 1, 1968

  • DFI
    Pin Piles For Structural Underpinning - Summary

    By Seth L. Pearlman

    Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou

    Jan 1, 2000

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • NIOSH
    IC 8764 Transducer Preparation And Gage Assembly Of The Bureau Of Mines Three-Component Borehole Deformation Gage

    By David L. Bickel

    The following instructions and descriptions are presented in two parts to assist an individual to make the borehole deformation gage transducer, and to assemble and test the three-component borehole d

    Jan 1, 1978