Search Documents

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • SAIMM
    A discrete event simulation approach for mine development planning at Codelco’s New Mine Level

    By I. Soto, E. Córdova, A. Anani

    The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which are difficult to achieve. Research has been condu

    Oct 1, 2022

  • TMS
    EMF Study Of Nb-Al Intermetallics

    By Pratheesh George

    Solid state galvanic cell with CaF2 as the electrolyte was employed for determining the thermodynamic properties of Nb-Al binary alloys in the temperature range of 973-1073 K. The activities and activ

    Jan 1, 2006

  • ISEE
    Controlled Blasting Technology for Tunnel Crossing Under High-speed Rail in Small Distance

    By Weiying Zeng, Shouwei Wang, Jinbei Zhong, Xiangdong Meng, Lingtian Meng

    "Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be

    Jan 1, 2017

  • ABM
    Modernização Do Sistema De Supervisão Da Mina, Britagem E Concentrador I Da Samarco Mineração

    By Alexandre Carvalho Martins

    Este trabalho tem por objetivo apresentar o projeto de modernização do sistema de supervisão da Mina, Britagem e Concentrador I da unidade de Germano da Samarco Mineração. A principal motivação que le

    Jul 30, 2018

  • NIOSH
    RI 6275 The Hydrocyclone In Clay Beneficiation

    By H. E. Powell

    This study was made to determine the capabilities and limitations of the hydrocyclone for separating quartz sand from impure clays, Optimum operating conditions for beneficiating typical subgrade clay

    Jan 1, 1963

  • ABM
    EFEITO DA TEMPERATURA DE ENCHARQUE E DO RESFRIAMENTO CRIOGÊNICO NO TRATAMENTO TÉRMICO DE LIGA DE Fe-Ni-Cr

    By Larissa Fernandes Nunes

    O presente trabalho teve como objetivo caracterizar a temperabilidade de uma liga Fe-Ni-Cr. Amostras do material foram submetidas a temperaturas de encharque de 800ºC e 1100ºC e resfriadas utilizando

    Oct 30, 2017

  • AUSIMM
    Origin of High-Grade Iron Ores at the Thabazimbi Deposit, South Africa

    By N J. Beukes, S T. Netshio, M O. de Kock

    The Thabazimbi iron ore deposit comprises a series of stratabound orebodies, on average 18 - 25 m thick that are aligned along the faulted basal contact between the Penge Iron Formation and dolostones

    Jan 1, 2005

  • SME
    Copper Leaching: 2014-2015 Global Operating Data

    By R. Scheffel, R. Washnock, G. Zarate

    "The second survey of global copper leaching operations has been completed, the data published in 1998 has been updated. A survey questionnaire was sent to 40 identified copper leach operations around

    Jan 1, 2016

  • NIOSH
    RI 7604 Mass Spectra And Analytical Correlations For 32 Alkyl Aryl Sulfides

    By J. E. Dooley

    A mass spectral scheme of analysis was devised which can be used to identify individually a single compound from a larger group of similar compounds. Mass spectra for 32 alkyl aryl sulfides are provid

    Jan 1, 1972

  • AIME
    Pittsburg International Session October, 1890 Paper - Aërial Wire Ropeways

    By J. Pohlig

    It is with more than ordinary pleasure that I have complied with the request of the President of the Verein Deutscher Eisenh?tten leute, to read before this meeting and in this country a paper on a sy

    Jan 1, 1891

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • IMPC
    Optimization of the design of AG Mill shell liners at the Gol-E-Gohar concentration plant

    By S. Banisi, A. Haji-Zadeh, H. Asadi, M. Maleki-Moghaddam

    One area in AG/SAG milling field which has received a great attention is the optimization of liner design for any application to increase the availability of mills. The Gol-E-Gohar iron ore concentrat

    Jan 1, 2014

  • CIM
    A Review of Exploration Work in the Rouyn Camp

    By J. G. MacGregor

    At this, the opening meeting of the Western Quebec Branch of the Institute, it seems fitting that the first paper presented should embrace a survey of the known mineral deposits occurring in the area,

    Jan 1, 1929

  • AUSIMM
    The Use of Magnesium Oxide and Iron to Predict Host Units in Grade Control and Exploration at Bulong Nickel Operation

    At Bulong, the mineralised (>0.8 per cent nickel) ore exists within numerous lithologies, which can and do occur coincidently. It is very important to discriminate between the different host units for

    Jan 1, 2000

  • CIM
    The Purchase of Mechanical Equipment for Mines

    By D. S. Hines

    The purchase of mechanical equipment for mines is not unlike the purchase of other materials or supplies in general principle, but on account of the major part such equipment plays in the operations,

    Jan 1, 1930

  • AUSIMM
    Port Hedland Harbour Tunnel

    By A Bennett, A Peck

    BHP has recently constructed a Hot Briquetted Iron Plant at Port Hedland in the Pilbara region of Western Australia. Supply of iron ore fines to the plant is by conveyor from the companyÆs existing Ne

    Jan 1, 1999

  • CIM
    Overview of overburden removal at Syncrude Canada Ltd.

    By Y. P. Malhotra, JE. C. Carter

    "Syncrude's overburden removal requirement ranges from 20 million to 30 million bank cubic metres per year to meet tarsand demands for the production of 129,000 barrels of synthetic crude oil per

    Jan 1, 1983

  • SME
    Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021

    By P. Nelson, R. O’Connell, J. Rostami

    Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u

    Jun 13, 2021

  • ABM
    Análise Do Teor De Carbono No Pó De Coletor E Na Lama De Alto-forno

    By Walisson Silva Gomes

    A injeção de carvão pulverizado pelas ventaneiras dos altos-fornos é um dos meios de redução de custos de produção do ferro gusa. Esta injeção deve ser de forma efetiva para evitar possíveis desperdíc

    Aug 17, 2017