Search Documents

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • SME
    Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”

    By J. R. Piper

    “Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e

    Jan 1, 2001

  • AUSIMM
    Visual Computing and Mine Design

    Visual computing opens the design process to a wider audience and allows rapid communication of mine plans to all stakeholders. The integration of software and hardware technologies that take advantag

    Sep 26, 2011

  • AUSIMM
    The Influence of Resource Rent Taxation on Mining and Investment Strategies

    By A D. Stewart Gillies

    Resource rent taxes are taxes which only become effective at such a time as a pre-determined rate of return has been achieved by an operation. Resource Rent Taxes have from time to time been considere

    Jan 1, 1995

  • SME
    Heap Leach solution management at Coeur-Rochester

    By Peter A. Anderson

    Innovative solution management is being used at Coeur-Rochester Inc. to increase bullion production and decrease overall costs. New operating programs call for reduced solution application rates to th

    Jan 1, 1989

  • NIOSH
    RI 7505 Technique Of Measuring Initial Deformation Around An Opening - Analysis Of Two Raise-Bore Tests

    By Galen G. Waddell

    This report describes a method of measuring and analyzing the initial deformation which occurs in the medium surrounding a mine accessway as the opening is created. Discussed are (1) the hypothesis up

    Jan 1, 1971

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • AUSIMM
    Benefits Related to Applications of a Mass Blast in Open Cut Mining

    By C Muñoz, N Ortega, J Vergara, D Avilés

    Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b

    Aug 24, 2015

  • SME
    Bacís Flotation Cell For Gold- And Silver-Beard Pyrite Recovery

    By J. R. Parga

    In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a

    Jan 1, 2009

  • NIOSH
    RI 7734 An Automatic Data Acquisition System For Underground Measurements

    By J. R. McVey

    A 10-channel automatic data acquisition system has been designed and environmentally packaged for use with underground strain-gage applications and associated instruments. The system uses commercially

    Jan 1, 1973

  • ISEE
    External Shock Migration for Buried Structures

    By Henry S. McDevitt

    External Shock Mitigation (ESM) is being studied as a possible means of retrofitting existing buried structures to provide additional protection from ground shock. As part of this study, two tests wer

    Jan 1, 1997

  • DFI
    Self Drilling Soil Nail Systems To Retain Caving Soils

    By Ali Porbaha

    The use of soil nailing technology as a cost effective alternative for excavation support and slope stabilization has substantially increased in the United States during the last decade. For example,

    Jan 1, 2006

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • CIM
    The First Electrolytic Copper Refinery in the USA at the Chemical Copper Co. Phoenixville, Pa – History Revisited

    By E. Wraith, W. W. Culver, B. Wesstrom, P. J. Mackey

    Electrodeposited copper of the 1860s was of unprecedented purity, although the profound significance of this achievement was not fully realised until the dawn of the electrical age a decade or so late

    Jan 1, 2019

  • ISEE
    A Practical Guide for the Blasting of Armour Stone or Riprap

    By Alastair Grogan, Ron Elliott, Dale MacLean

    Blasting for armour stone presents many unique challenges. Often, blasters get themselves into trouble when they assume that they can simply modify a production blast design to produce the required fr

  • SAIMM
    The Use Of Titanium Hydride In Blending And Mechanical Alloying Of Ti-Al Alloys - Synopsis

    By I. A. Mwamba

    Titanium sponge, which is almost pure titanium, is extremely ductile and not easily processed into titanium powder. One method of producing powder is the hydride-dehydride (HDH) process, where titaniu

    Jan 1, 2011

  • NIOSH
    RI 7936 Reducing Surface Hot Shortness of Copper-Containing Steels Using Silicon Additions and Controlled Reheating Conditions

    By Mark I. Copeland

    This study was conducted by the Bureau of Mines to determine the effect of steel reheating practices in burning natural gas on the amount of silicon required to prevent the formation of copper on stee

    Jan 1, 1974

  • TMS
    Phase Equilibria And Thermodynamics In The Ag -Pb -S Ternary System (23244ae0-59da-43de-b33b-6d662ef5136c)

    By R. Hurman Eric

    Within the Ag-Pb-S ternary system, the boundaries of the immiscibility region together with the tie-line distributions were re-established at 925°C by the equilibrium-quenching technique where samples

    Jan 1, 2003

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • NIOSH
    IC 8669 Methods And Costs Of Dust Control In Stone Crushing Operations

    By Robert J. Evans

    Capital and operating costs were estimated using a wet suppression, fabric filter, and a combination system of the two for hypothetical hard rock stone crushing plants located in central Pennsylvania,

    Jan 1, 1975