Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
IC 8209 Survey Of Burning Coal-Mine Refuse Banks (73507d9c-f1e3-4b19-b59f-609340764b75)
By R. W. Stahl
Burning coal-mine refuse banks were surveyed in 15 States. The following characteristics were tabulated for 495 hanks: County; name, population, and distance of nearest town; size and status of bank;
Jan 1, 1964
-
Coastal superquarry: design and proposed development of Rodel Quarry on South Harris, Outer Hebrides, Scotland
By D. R. Wardrop, G. Walton
Paper presented at the UK minerals industry conference held in Leeds, UK, 3-5 April 1995. A description is given of the approach that has been taken to the design of the 550 000 000 t superquarry with
Jul 1, 1996
-
Dust Control at Steep Rock Iron Mines Pelletizing Plant
By P. S. Capper
"Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr
Jan 1, 1976
-
The plasma manufacturing of titania pigment and nano-titania in a pilot plant - Synopsis
By J. T. Nel
The establishment of a pilot plant for the continuous production of titania pigment and nano-titania is discussed. The plant was designed, constructed and operated on the Necsa site. The TiO2 producti
Jan 1, 2010
-
OFR-16-88 Shearer Mounted Dust Collector; Evaluation Of Ventilated Cutting Drums
By Jonathan S. Kelly
Effective control of respirable dust is one of the most serious problems associated with longwall mining in the United States. This report describes the development and the underground evaluation of v
Jan 1, 1987
-
Crushing and screening circuits
By D. W. Zandee
"IntroductionHaving mined an economic mineral bearing rock which is of insufficient grade to warrant direct smelting, upgrading or beneficiation is required to make it an economically viable ore. The
Jan 1, 1989
-
Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam
By Vincent Roy
Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management
Aug 1, 2013
-
Concept Design of the Central Business District Rail Link, Auckland
By J Q. Cooper
The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing
Mar 8, 2011
-
The Origin, Distribution and Geological Setting of Copper and Nickel Sulfides in the Riwaka Complex, North West Nelson, New Zealand
In North-West Nelson the Riwaka Complex, a linear basic intrusive complex, is exposed for approximately 45 km. Some 500 km south, across the Alpine Fault, a linear zone of similar but less well known
Jan 1, 1980
-
Needed New Technologies for the Development of Earth Resources: Energy, Water, Wastes, Mining
Our ultimate resources come from the Sun and the Earth System. At this time we face a world crisis in energy, water and soil resources. Global pollution problems are increasing in almost all nations.
Jan 1, 1995
-
RI 8775 An Evaluation of Aluminum Smelter Potlining as a Substitute for Fluorspar in Cupola Ironmelting and in Basic Oxygen Steelmaking
By Victor R. Spironello
The Bureau of Mines has studied slags associated with ferrous melting, to evaluate substitutes for the auxiliary flux mineral, fluorspar. A waste material recovered from alumina reduction cells, "used
Jan 1, 1983
-
IC 7473 Making Iron Powder in the Tunnel Kiln
By V. H. Gottschalk
Among the procedures developed by the Germans for providing the tonnage of iron powder needed to make rotating bands for artillery shells is the use of a ceramic tunnel kiln, not only for finishing th
Aug 1, 1948
-
Thiourea As A Lixiviant For Gold And Silver
By J. Brent Hiskey
Thiourea is a reagent capable of complexing gold and silver. With the proper oxidant, thiourea can effectively dissolve metallic gold and silver. A thiourea leaching system possesses potential advanta
Jan 1, 1981
-
A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New Mexico
By SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
Utilization Of Wet FGD Material For AMD Abatement In Underground Coal Mines
By J. C. Ashby
Electric utility response to certain amendments of the Clean Air Act has resulted in a production of several types of alkaline coal combustion byproducts. Alkaline combustion byproducts are gaining in
Jan 1, 1998
-
Towards Sustainable Mining - Made-in-Canada solution to driving environmental and social performance in mining
About MAC ? The national organization of the Canadian mining industry ? Mining, smelting and refining of base and precious metals ? Mining of iron ore, diamonds, uranium, oil sands, coal and
Aug 1, 2013
-
Institute of Metals Division - Precipitation Phenomena In Supersaturated Solid Solutions
By A Guinier
RECIPITATION in alloys is undoubtedly one of the most essential phase transformations in metallurgy and, besides, it is a phenomenon of great interest to physicists. It seems then that it can be chose
Jan 1, 1957
-
RI 5967 Thermodynamic Properties Of Strontium Bromide And Strontium Nitrate ? Introduction And Summary
By A. R. Taylor
In recent years, thermodynamic data have been used to a greater degree than ever by the chemical and metallurgical engineer as a means of predicting and controlling chemical reactions. To satisfy the
Jan 1, 1962
-
Policy to Practice: Strategic Environmental Assessment in the Real World
By F. M. McEvoy, E. J. Steadman, R. Murfin
In England, the provision of aggregate is determined by the historical relationship between construction and aggregate consumption. This approach does not necessarily lead to sustainable decision-maki
Jan 1, 2005
-
Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low Overburden
By Chris Ashton, Andreas Rädle, Taner Aydogmus
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich
Jan 1, 2016