Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Innovative Technology for Optimised Thickening Sedimentation

    Innovative Technology for Optimised Thickening Sedimentation

    Sep 13, 2010

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • AUSIMM
    21st Century Bond

    By M Sherman

    The challenge facing the engineering provider is to calculate throughput rates when faced with disparate specific energies calculated by different testing methodologies. Typically, an ownerÆs team wou

    Aug 12, 2013

  • AUSIMM
    Process Options for Difficult Arid-Region Nickel Laterites

    Process Options for Difficult Arid-Region Nickel Laterites In the absence of the discovery of significant nickel sulfide deposits, the future of Australia's nickel industry will increasingly dep

    Sep 13, 2010

  • AUSIMM
    A Contribution to the Study of the Molybdenite Pipes of Kingsgate, N.S.W., with Special Reference to Ore Mineralogy

    The Kingsgate molybdenite pipes are considered on petrochemical data and field occurrence to be, possibly, epi-magmatic plutonic offshoots grading into hydrothermal bodies. There is reason to believe

    Jan 1, 1962

  • AUSIMM
    Development of a Froth Dropback Measurement Device

    Development of a Froth Dropback Measurement Device

    Sep 13, 2010

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete?

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 krn NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • AUSIMM
    Water Balancing in Mineral Processing - Issues and Opportunities

    Water Balancing in Mineral Processing - Issues and Opportunities

    Sep 13, 2010

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • AUSIMM
    Ecological Fuel from High-Sulfur-Content Coal

    Ecological Fuel from High-Sulfur-Content Coal

    Sep 13, 2010

  • AUSIMM
    Epithermal Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone, New Zealand

    In the Ngakuru area, zeolite deposits occur in late Quaternary lake sediments and ignimbrites. The deposits are associated with sinters, hydrothermal eruption breccias, and quartz-adularia altered fau

    Jan 1, 2002

  • AUSIMM
    Mineral Composition of Sulphide Ores from the Peelwood, Cordillera and Mt. Costigan Mines, Peelwood District, N.S.W.

    The Peelwood district of New South Wales is located some 65 miles south of Bathutst on the Tuena-Crookwell road. A number of occurrences of lead-zinc-copper ore are known from this district but only t

    Jan 1, 1961

  • AUSIMM
    The Mining and Forestry Industries - Will They Ever See Eye to Eye?

    By A P. Tinnelly

    This paper explores the structural/physical and policy based issues that have lead to the apparent resource conflict between Forestry and Mining on the West Coast. Both industries are important to th

    Jan 1, 1996

  • AUSIMM
    Distant Fields - Are They Really Greener?

    The Australian mining industry is at an interesting stage in its development. Of the large number of mining companies in Australia, some are still solely domestic in their focus, others have made thei

    Jan 1, 1995

  • AUSIMM
    Electrum and Gold Fineness of Some Hauraki Epithermal Gold-Silver Deposits

    By G A. Challis, A B. Christiel

    Microprobe analyses of electrum grains in some Hauraki Au-Ag deposits indicate that gold fineness is in the range of 500 - 800 (50 - 80 per cent Au), but for most deposits the range is usually narrowe

    Jan 1, 1992

  • AUSIMM
    Simulation investigation of flow patterns and feeder loads at hopper/feeder interface

    By J Guo, K Williams, J Y. Guo, A W. Roberts, M Jones, B Chen

    Numerical simulations using the discrete element method (DEM) were carried out to investigate the flow patterns and stress field redistribution at the hopper and feeder interface. The influences of di

    Jul 24, 2017

  • AUSIMM
    The Optimisation Tools for Open Pit Strategic Planning

    By Y Ren

    ?ptim?sgtion t?ols nos ope? 0iu ?ingc s?ch as the cche??ling and?pi? k?(i?isatTon tool{ ?ave bg?ome(?osd-dvfective way? to e?iluata open`¦it mi~e!p?n?ept as w?ll asá?}prmv?ng mine?projecW`value> ?ower

    Aug 12, 2013

  • AUSIMM
    Gold Ore Treatment at Macraes Flat

    Macraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL

    Jan 1, 1992

  • AUSIMM
    Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia

    By H Firdausi, I Pasek, T Chenier

    The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start produ

    May 9, 2016

  • AUSIMM
    Electroosmotic Dewatering and Consolidation of Mineral Waste Tailings

    Electroosmotic Dewatering and Consolidation of Mineral Waste Tailings

    Sep 13, 2010