Organization
  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Preconcentration at Mt Carbine Tungsten Mine using sensor-based ore sorting

    By R Kroukamp, G Rech

    CRONIMET Australia in cooperation with Speciality Metals International, the mining lease holder of the Mt Carbine Tungsten mine, have demonstrated the preconcentration and processing of large (>12 mil

    Nov 10, 2020

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Management of Acid Drainage in the Australian Minerals Industry

    Confirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A

    Jan 1, 2003

  • AUSIMM
    Cost-Efficient Implementation of a Greenhouse Gas Reduction Roadmap in the Mining and Metallurgy Industry

    By M Russ, J Gediga

    This paper shows an economic feasible approach to implement greenhouse gas (GHG) reduction measures into the mining and metallurgy industry (MMI). The goal to improve energy consumption is directly li

    Jan 1, 2009

  • AUSIMM
    Objective Geological Logging using Geochemical Multi-Element Data - Plutonic Gold Mine, Western Australia

    By M D. Taylor, G Duclaux, K Atkinson, L A. Fisher, A R. Latham, M F. Gazley, S J. de Beer, C M. Tutt

    Geological logging by mine and exploration geologists involves the application of a logging code that requires a geologist to make a subjective decision to classify a particular rock unit. This will m

    Sep 26, 2013

  • AUSIMM
    Gold Recovery on the Shotover River

    Gold was first discovered on the Shotover by Thomas Arthur in 1862, and soon there were over 3000 miners working on the river. It has often been called the richest river in the world. Most countries p

    Jan 1, 1983

  • AUSIMM
    Curved Pulp Lifters – Can They Save Energy?

    By R J. Soriano, S Ciutina

    The Masbate gold deposits are situated on the island of Masbate, 350 km south of Manila. A new plant was commissioned in April 2009. The grinding circuit consists of one semi-autogenous (SAG) mill Ø9.

    Sep 1, 2014

  • AUSIMM
    AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years on

    By J Missen, P Currie, J Bohan, D Clark

    AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates

    Jun 22, 2016

  • AUSIMM
    A Reality Check on Hedging Practices in the Mining Industry

    By D Lautier, A A. Ndiaye, A Galli

    Traditionally gold producers had built up hedge books to protect themselves against adverse changes in the commodity price, but diversified mining groups were staunchly opposed to hedging in any shape

    Jan 1, 2009

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    A Historical Review of the Treatment of Preg-Robbing Gold Ores - What has Worked and Changed

    By K Afewu, R Dunne, W P. Staunton

    The treatment of preg-robbing gold ores has always been a technical challenge in the gold industry. Early solutions included removal of preg-robbing carbonaceous material by flotation, the addition of

    Sep 26, 2013

  • AUSIMM
    Propagation of the South Wedge - Drill and Blast

    By R Cunningham, P Duniam

    Late in 2005 it became apparent that cave propagation at the Northparkes Mine was not progressing as planned. By mid-2006 sufficient Reserves were identified to warrant an extensive drill and blast pr

    Jan 1, 2007

  • AUSIMM
    Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates

    By D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton

    The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w

    Oct 29, 2012

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold Mine

    By P Trout, B Macaulay

    Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success

    Jan 1, 2005

  • AUSIMM
    Vertical Pit Mining - A Novel Alternative to Open Pit or Underground Methods for Mining of Appropriate Massive Shallow Orebodies

    By P J. Terbrugge

    The concept of vertical pit mining has been developed as an alternative mining method for the exploitation from surface of small, vertical or near-vertical, massive orebodies down to depths of some 20

    Jan 1, 2000

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Surface and groundwater monitoring and seepage control at the Sungun Copper Mine

    By N Pirouznia, F Rashidi Nejad, S Naraghi

    Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw

    Jul 23, 2018