Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine

    By B Ganesia, H Sahupala

    PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underg

    Jan 1, 2002

  • AUSIMM
    Looking for Fractures - Integrating Geochemistry with Hydrogeology to Find Inter-Aquifer Leakage above Dewatered or Collapsed Coal Seams

    By P Mulvey, M Stuckey

    "Inter-aquifer leakage due to fractures caused by coal seam gas extractions or longwall mining is an important issue for both the gas and coal industries. Currently, predicting stress induced macro-po

    Nov 26, 2013

  • AUSIMM
    From Mt Goldsworthy to Area C ù Reflections on Forty Years of Iron Ore Exploration in the Pilbara

    By D A. Kepert, I J. Tehnas, M A. Pudovsk

    BHP Billiton (BHPB) was the first company to start iron ore mining in the Pilbara at Mt Goldsworthy in 1966 through Goldsworthy Mining Limited (GML - then Consolidated Goldfields Australia, Cyprus Min

    Jan 1, 2002

  • AUSIMM
    The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II

    By Baker G

    The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then

    Jan 1, 1953

  • AUSIMM
    The Kwademen Gold Deposit: A Polymorphic Mineralization within a Precambrian (Birrimian) Greenstone Belt in Burkina Daso, West Africa: A Case History

    The Kwademen Au deposit was discovered in 1977- 1978 following a regional geochemical survey carried out as part of a UNDP (United Nations Development Programme) and BUMIGEB (Bureau des Mines et de

    Jan 1, 1988

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Carburisation and melting of hot compacted iron in a coke bed

    By M Kim, J Park, I-K Suh, E Kim, J Lee

    One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp

    Aug 21, 2024

  • AUSIMM
    Blasting related indices as the key to underground blasting improvements in a challenging rock mass

    By J Jackson, E Sellers

    Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto

    Oct 16, 2017

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    What the Internet of Things Means to Mining

    By D Kent, D Eisner

    A lot of talk has been generated about the so called ‘Internet of Things’ (IoT) and its potential to transform the way we interact with our homes and devices. But the true potential and value of IoT i

    Nov 4, 2015

  • AUSIMM
    Flotation of Hematite Using C6-C18 Saturated Fatty Acids

    The homologous series of saturated fatty acids investigated in this study generally show a steady gradation of properties with chain length. The solution pKa values were assumed constant at 4.9, howev

    Jan 1, 2005

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    The Effect of Particle Size Distribution in Electrostatic and Magnetic Separation on Mineral Recovery and Yields

    By J Ledgerwood

    Namakwa Sands is a mineral processing company based on the West Coast of South Africa and is solely owned by Exxaro Resources Limited. Mineral ore is mined and processed, concentrated and both chemica

    Oct 5, 2011

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Importance of Effective Sampling and Test Work Protocols for Process Plant Design

    By N Guresin, A Cooper, L Lorenzen, H Muller, S C. Dominy

    Sampling and metallurgical test work during various phases of engineering?studies?is of?paramount importance for a robust processing plant design. When developing a process flow sheet, risks in achiev

    Aug 21, 2012

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Prediction of Yttrium, Lanthanum, Cerium and Neodymium Leaching Recovery from Apatite Concentrate Using Artificial Neural Networks

    By A H. Bagherieh, S Mesroghli, H Jorjani, S Chehreh Chelgani

    The rare earth elements (REEs) assay and recovery in leaching processes is being determined using expensive analytical methods, ICP-AES, and ICP-MS. This paper presents a neural network model to predi

    Jan 1, 2008

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System

    By J Knoblauch, D, P J. J Strobos, C Foggo

    The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding

    Jan 1, 2006

  • AUSIMM
    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021