Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study
By E Philippa, J Vitanza, C Hawtin, B Miller
B Miller , E Philippa , C Hawtin and J Vitanza
Mar 22, 2022
-
Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed Permeability
By A M. Nyembwe, A M. Garbers-Craig, R Cromarty
With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an
Jul 13, 2015
-
TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture
By J M. Shekiro
In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most
Oct 5, 2011
-
The Mine Management System at Olympic Dam Mine
The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans
Jan 1, 2000
-
A Case Study of Water Management on Closure of an Open Pit Mining Operation in North Queensland, Australia
By P Ritchie, E H. Briese, N A. Currey
Kidston Gold Mines, located in semi-arid North Queensland, Australia is currently in its closure phase. Highly innovative and comprehensive rehabilitation strategies were employed at the site, includi
Jan 1, 2003
-
The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine
By K Rees
In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow
Mar 26, 2012
-
The Use of Polysulfide as an Alternative Sulfidising Reagent for the CPS Flotation of Oxide Copper Ores
By G Tsatouhas, R Newell, K Y. Wong
A sulfide ion selective electrode was used to control sulfidiser addition in the flotation testing of a synthetic and a naturally occurring ore containing malachite in order to compare the behaviour o
Jan 1, 2005
-
Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY
Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years
Aug 1, 2010
-
Process optimization of Mount Morgan gold tailing retreatment plant
By Hampshire MJ
The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco
Jan 1, 1986
-
Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads
By Y Durkheim, P Saunier, L Ameglio
"In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro
Jul 27, 2015
-
X-ray Computed Tomography – a Geometallurgical Tool for 3D Textural Analysis of Drill Core?
By M A. Jardine, J A. Miller, M Becker, M Harris
"Although the role of texture has been increasingly recognised as a geometallurgical indicator of ore characteristics and their variability, the ability to appropriately quantify and correlate it with
Jun 15, 2016
-
The effect of vane shear rotation speed on the estimation of tailings undrained strength
By B Wentzinger, Y Keulemans
This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va
Jul 1, 2021
-
Investing in new process improvement technology: reducing the risk of implementation – a way forward
By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig
Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change
Aug 29, 2018
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia
By A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Risk Assessment of Historical Mine Waste Using Chemical Analysis and Ocular Mineral/Rock Classification û A Comparison
By S SSdbom
A comparison was made between chemical analysis and ocular mineral/rock classification in health-based risk assessment of historical mine waste produced between 1625 and 1975. Large parts of the mine
Jan 1, 2008
-
Project Controls for Large Mining Projects - The Client's Perspective
Control of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf
Jan 1, 1993
-
The Status of Mine Water Pollution in South Africa
This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles
Jan 1, 2003
-
Spatial Modelling and Optimisation of Geometallurgical Indices
By M J. Newton
As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri
Sep 5, 2011
-
Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study
By D Blair, T Scutts, L Fergusson
This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh
Jul 16, 2014
-
Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit
By D Clarke, I Minniakhmetov
The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho
May 24, 2023