Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Implementation Strategies for Energy Effectiveness and Sustainability – Example of Anglo American Platinum

    By O Bascur, A Soudek

    Large metallurgical complexes are substantial users of energy, water and assets. To improve the effectiveness of energy and assets the quality of the data and events become paramount for real-time ope

    Sep 1, 2014

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Improvements in the Understanding and Applications of Backfill for Improving Ground Stability in Underground and Open Pit Operations

    The safety culture in mining has progressed towards a zero tolerance of injury. This change has required that some historically inherent risks of mining are engineered out or reduced. One of the signi

    Jun 1, 2010

  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Incorporating Sustainability into Mining Plant and Infrastructure Design

    By A Murphy

    Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They

    Jul 16, 2014

  • AUSIMM
    Geology and Ore Reserve Evaluation at Renco Mine, Zimbabwe

    Gold at Renco occurs in association with pyrite, pyrrhotite, chalcopyrite and quartz and is confined to a series of brittle fractures and fault breccias (reefs) preferentially developed within an anas

    Jan 1, 1990

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Characterising the Spontaneous Combustion Propensity of Waste Rock

    By J Theiler, B Beamish

    The presence of reactive metal sulfide minerals in waste rock contributes to the hazard of spontaneous combustion in dumps, as these minerals react with air and water entering the dump at ambient temp

    Jun 28, 2016

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Soft Computing Approach to Predict Blast-induced Flyrock

    By N Gupta, R Trivedi, S Bhandari

    Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan

    Aug 24, 2015

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater Quality

    By C Linklater, J Chapman, A Watson

    Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl

    Jun 28, 2016

  • AUSIMM
    Mining Geophysical Methods for the 21st Century

    To help meet the challenge of mine finding at the start of the 21st century, the exploration geophysicist will have at his command a powerful range of tools, some new, some improved, and some whic

    Jan 1, 1986

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn Mines

    By Phelan JM

    Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id

    Jan 1, 1988

  • AUSIMM
    3D mine mapping – improving grade control and reconciliation in underground mines using photogrammetric imagery and implicit modelling techniques

    By R H. Knight

    Production mine geology must be accurate and efficient in order to reduce risk and ensure that ore value and mining operation revenue are maximised. Present grade control practices are commonly based

    Sep 20, 2017

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009