Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Indicator kriging saves the day – improving reconciliation

    By A Purton, C Taylor, E Conroy

    The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties

    Mar 22, 2022

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    Sustainable Development Reporting in the Australian Minerals Processing Industry

    By A Bossilkov

    Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con

    Jan 1, 2004

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • AUSIMM
    Enhancing energy efficiency and reducing water consumption in TowerMill circuit through design and optimisation

    By H Ishikawa, S Palaniandy

    The gravity-induced stirred mill such as the TowerMill is an energy-efficient grinding solution used in secondary, tertiary, and regrinding duties in the mineral processing concentrator. The interest

    Aug 24, 2022

  • AUSIMM
    Determining the Pressure Pulse for an Air Blast

    By M A. Tuck

    Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo

    Jul 1, 2013

  • AUSIMM
    Surrounded by Change - Collective Strategies for Managing the Cumulative Impacts of Multiple Mines

    By D Brereton, C J. Moran

    Intensive resource extraction, in the form of multiple mining operations, presents significant assessment and management challenges for resource developers, governments, community and the environment.

    Jan 1, 2009

  • AUSIMM
    Three Decades of Gold Production at the Newmont Tanami Operations

    By A Cranley, A Giblett, S Thacker

    The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil

    Sep 1, 2014

  • AUSIMM
    On the Use of Mechanistic Blast-Outcome Measurement and Modelling for Optimisation of Explosive Selection in Underground Mining

    By A S. Lund

    Optimisation of the underground mining production process benefits from informed decision making during the process of explosive rock fragmentation. Selection of the most appropriate bulk explosive pr

    Jan 1, 2001

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    How a frontline planning and commitment system improves trust, commitment and results in operations

    By G Britton, P Moynagh

    As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control

    Oct 16, 2017

  • AUSIMM
    Evaluation of Exploration Projects

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Sinking the New Broken Hill Consolidated Circular Airshaft

    The New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the

    Jan 1, 1940

  • AUSIMM
    Behaviour-based Safety with a Foreign-based Workforce

    By R Brown

    The Singapore Land Transport Authority Contract C917A is for the design, construction and completion of all outstanding works under the original Contract 917, including taking over the design and cons

    Sep 17, 2014

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Application of an Integrated Liberation Leach Model for Process Optimisation

    By T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen

    "The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model

    Oct 10, 2016

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States Perspective

    By V Pfannenstiel

    The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental

    Jul 10, 2012