Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Nickel Metal from Sulphide Concentrates Without Smelters - A Yakabindie Process and Project Up-date

    By Johnson G. D

    Confidence in Yakabindie becoming a truly cost competitive nickel project has risen recently because of: ò the emergence of an economically effective contract mining climate; ò the delivery of cheap

    Jan 1, 1996

  • AUSIMM
    Underground Coal Mine Modelling-A Total Systems Simulation Approach

    By Manula C. B

    The total systems model for underground oal mining planning and design is a set of omputer programs which encompasses a realis- ic reproduction of the interaction between he geological, environmenta

    Jan 1, 1977

  • AUSIMM
    Environmental Issues in the Development of the Pasminco Century Project

    The Century zinc-lead orebody was discovered in 1990 and contains sufficient reserves to sustain open cut mining at 5 Mtpa of ore for approximately 20 years. It is proposed to pipe mineral concentrate

    Jan 1, 1998

  • AUSIMM
    The Peak Hill High Sulphidation Gold Deposit, NSW (b7de7a3e-9b00-482f-8de6-d6281ddb9569)

    By Corbett GJ, Leach TM

    ABSTRAC'T' Although hosted within an Ordovician magmatic arc, the Peak Hill high sulphidation system displays features typical of younger Pacific Rim high sulphidation epithermal gold depos

    Jan 1, 1995

  • AUSIMM
    Acid Rock Drainage Treatment Technologies ù Identifying Appropriate Solutions

    By N Murphy and, S Santomartino, M Cramer

    Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at

    Jan 1, 2003

  • AUSIMM
    Co-Mixing of Tailings, Waste Rock and Slag to Produce Barrier Cover Systems

    By D Landriault, G W. Wilson, L Langetine and

    Engineered soil covers are used for final closure options for both waste rock and tailings disposal facilities. Currently, cover construction requires excavation of appropriate cover material from a n

    Jan 1, 2003

  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Reducing Mine Closure Risks ù A Team-Based Approach

    The Closure Risk model was developed as a new tool to aid decision makers in the complex area of mine closure. It uses a simple analytical technique that allows the decision maker to simplify what is

    Jan 1, 2003

  • AUSIMM
    Importance of Early Rehabilitation Planning - Case Studies from North West Queensland

    By M J. Gillespie, P D. Erskine

    Mine site rehabilitation generally includes the re-shaping of overburden to create a final landform, manipulation of substrates and subsequent revegetation. Due to the wide range of environmental vari

    Jul 10, 2012

  • AUSIMM
    Development of Climate-based Suitability Indices for the Improvement of Success in Rehabilitation

    By A Lechner, T Baumgartl, S Arnold, P Audet

    When revegetation is a part of a rehabilitation strategy at mine sites in arid and semi-arid environments, its success can be strongly affected by the availability of water prior or during the time of

    Jul 16, 2014

  • AUSIMM
    Effective Commissioning

    By Lane G

    This paper addresses project commissioning, that is, activities that culminate in the transfer of a project from the construction phase to routine plant operation. These activities should be initia

    Jan 1, 1997

  • AUSIMM
    Location Aware Mine Machinery for Productivity and Safety Improvements

    Fleet management systems have been adopted by many open pit mines throughout the world and the resulting improvement in truck cycle times has been one of the most significant contributors to mine effi

    Jan 1, 2008

  • AUSIMM
    Automated characterisation of the dump materials

    By N F. Glenn, S Thiruchittampalam, B P. Banerjee, S Raval

    The determination of shear strength parameters for the spoil material plays a crucial role in the assessment of a dump’s stability; nevertheless, their evaluation necessitates laborious laboratory exp

    Sep 1, 2024

  • AUSIMM
    Brief Outline of Mount Isa Copper Smelter

    The equipment and general smelter layout for the Mount Isa Copper Smelter were designed by engineers associated with the American Smelting and Refining Company and by Mount Isa staff engineers. The fi

    Jan 1, 1953

  • AUSIMM
    The extraction of white phosphorus in molten salt

    By X Yang

    White phosphorus (P4) is a critical element in industry, but its current production from phosphate rock using the carbothermal reduction method raises significant environmental and health concerns. Th

    Aug 21, 2024

  • AUSIMM
    Zonation in Skarns û Complexities and Controlling Factors

    By L D. Meinert

    Skarns typically are zoned and the deposit- or district-scale zonation pattern is an important tool in exploration for skarn deposits. Zonation in individual deposits has been described in many public

    Jan 1, 2008

  • AUSIMM
    Monitoring as an input to support and sequence design

    By C Hall, K Williams, B Keogh, S Wong

    Cannington mine is a silver lead zinc operation located in north west Queensland. The operation has been in production since 1997. Ore is primarily moved through an underground material handling syste

    Nov 30, 2018

  • AUSIMM
    A Modified Cable Bolt System For The Support Of Underground Openings

    By Worotnicki G, Tillmann V. H

    Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was

    Jan 1, 1983

  • AUSIMM
    Comparison of Supergene Mimetic and Supergene Lateritic Iron Ore Deposits

    By R C. Morris

    Supergene lateritic iron ores are uncommon when compared with the vast tonnages of BIF-hosted microplaty haematite ores of the world or with the dominant supergene mimetic martite-goethite ores of the

    Jan 1, 2009

  • AUSIMM
    Keynote Environmental Address

    The geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di

    Jan 1, 1994