Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Seismically Active Mines ù To Buy or Not to Buy
In recent years there have been many changes in mine ownership due to the on-going rationalisation towards larger mining companies. Larger companies inevitably find it hard to manage small mining oper
Jan 1, 2002
-
The Development of Acoustic Emission and Microseismic Monitoring Techniques in China
By Wu Y, Qu Q
The Central Coal Mining Research Institute has developed the MAE acoustic emission monitoring system, the BD4-1 portable acoustic emission monitor and the MRB rock burst monitoring system. In the MAE
Jan 1, 1991
-
Northern Sewerage Project - Liner Selection in a Corrosive Environment
By P J. Hansen, D G. Franklin, M E. Trim, J V. Myers
The Northern Sewerage Project (NSP) is an upgrade to one of MelbourneÆs ageing, under-capacity trunk sewers. It will reduce the volume and frequency of wet-weather overflows to the Merri and Moonee Po
Jan 1, 2008
-
Recovering RE with NH<sub>4</sub>Cl Roasting from Bastnasite Ore
By Q Xin, X Shengming, C RuÆan, Z Zhigeng a
The optimum defluorinating conditions for Sichuan bastnasite crude ore were determined by orthogonal experiments. Over 95 per cent fluorine in the crude ore was stripped by roasting 30 minutes of the
Jan 1, 2000
-
Acid Generation Behaviour of Chalcopyrite and Pyrite Under Column Leach Conditions
By A R. Gerson
Pyrite, chalcopyrite and mixed sulfide samples, with and without quartz (5 wt per cent S), were subjected to column leaching to mimic natural weathering (cyclic wetting and drying). The pH and SO4 2-
Jan 1, 2003
-
Sampling Quality Assurance and Quality Control Requirements for Mining Projects
The creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl
Mar 1, 2010
-
Signalling Equipment for Shaft Hoisting at North Broken Hill Limited
The mmmg operations carried out by North Broken Hill Limited, necessitate the use of four shafts for the haulage of ore, men, and supplies. These are:-1. Blackwood's Shaft.-British Section, which
Jan 1, 1940
-
Pyrite Oxidation Rates Determined Based on Quantitative Mineralogy of Long-Term Column Leaching Tests
By N DavT
Pyritic tailings from the Quirke mine waste management area in Elliot Lake, Ontario were subjected to long-term column leaching experiments in two PVC columns measuring 122 cm in height and 15.2 cm in
Jan 1, 2003
-
The Effect of Deep Bed and High Suctions on the Iron Ore Sintering Process
The effects of changes in sintering bed height, coke fuel, suction and basicity on sinter productivity, physical strength and mineralogy were determined. It was found that, for a given iron ore, th
Jan 1, 1975
-
Characterisation of Gold Ore from the Nick O’Time Shoot (Tarnagulla, Australia) Using High Resolution X-ray Computed Tomography
By I M. Platten, Y Xie, B W. Cuffley, S C. Dominy
"Geometallurgical programs require the collection of representative samples for geochemical, mineralogical and metallurgical test work. Such protocols must be designed to suit the style of orebody in
Jun 15, 2016
-
The Discovery and Geology of the Argyle Diamond Deposits, Kimberley, Western Australia
By Smith CB, Boxer GL
The Argyle diamond deposits in the East Kimberley were found as a result of a long term exploration programme, begun in 1972 by the Kalumburu Joint Venture (KJV), to search for diamonds on the Kim
Jan 1, 1984
-
Volcanogenic Cu-Pb-Zn Mineralization in the Mons Cupri District, West Pilbara
The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t
Jan 1, 1973
-
Oaky Creek Coal - Improving Productivity
By Lynch P
Oaky Creek Coal Pty Ltd. currently mines high quality coking coal from both underground and open cut operations at its Oaky Creek Mine. Coal is transported by rail to the Dalrymple Bay Coal Terminal s
Jan 1, 1998
-
Clarain and Durain of Greta Coal
By Langham B. M
A chemical study of the petrographic components of Greta (Maitland) coal, carried out by the Metropolitan Gas Co. (Melbourne), has revealed an anomaly in the composition of the durain which was though
Jan 1, 1947
-
The Status of Oil Exploration in Western Australia
Despite extensive oil exploration in"Western Australia over the past 12 years no commercial oil fields have yet been found. A total ' of 66 test wells have been drilled throughout the State but
Jan 1, 1964
-
Recent Developments at Olympic Dam
The Olympic Dam deposit is located some 600 km north of Adelaide in South Australia. It was discovered in 1975 by Western Mining Corporation and in 1979 a joint venture was formed with British Petr
Jan 1, 1996
-
The Future of Geological Education in the Pacific
o Resource production is essential for society. o Demand for resources will increase as population grows.o Resource industries are the main consumer of trained geologists.o The lead time from(1) train
Jan 1, 1990
-
Water Supply Development for the Paddington Gold Project
By Boyes B. A, Haydon D. J
The Paddington project is a gold mining and processing operation located 35 km north of Kalgoorlie in the Eastern Goldfields region of Western Australia (Figure 1). The project, which is operated b
Jan 1, 1988
-
Geology and Mineral Potential of the Ranger Project Area, Northern Territory
The Ranger Project Area covers 78.6sq km and is approximately six km east-west by 14km north-south (Fig. 1). The area is known to con- tain two uranium orebodies, Ranger No. 1 and No. 3, two uraniu
Jan 1, 1984
-
Monitoring Degradation of Coke within the Blast Furnace via Tuyere Coke Sample
BHP Steel International's Newcastle blast. furnaces have operated since their caimissioning on cake based on local low rank coals. In the early 1960's Newcastle coke was believed to be t
Jan 1, 1987