Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis of Particle Size Distribution in Dump Leaching Using Aerial Image Analysis and Verification by Rock Blasting Models
By Shuo Zhang, Wenying Liu
"In dump leaching, the efficiency of metal extraction from ores is strongly influenced by the mechanisms of fluid flow. Particle size distribution acts as a fundamental parameter in the determination
Jan 1, 2017
-
Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction
By R. M. S. Häggblad
The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de
Jan 1, 2005
-
A Process for Preparing Tungstic Trioxide of High Purity from a Canadian Scheelite Concentrate
By W. A. Gow, J. A. Vezina
"A new process for treating scheelite for the production of tungstic tri-oxide is described. The novelty of the process resides in that an ion-ex-changer is used to convert sodium tungstate to either
Jan 1, 1966
-
Modeling & Software for Control Purposes of a Direct Blister Smelter
By Tuula Mäkinen, Lauri Pesonen, Peter Björklund, Jouni Pihlasalo, Mikko Korpi
Outotec Direct Blister Flash Smelting technology has proved to be an efficient and environmentally friendly way to treat copper concentrates from the Zambian Copperbelt at Konkola Copper Mines' (
Jan 1, 2011
-
Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change
By C. H. Buck, A. J. Taylor
"In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in
Jan 1, 2018
-
The Utilization of High-Iron Chrome Ores
By Marvin J. Udy
THE preparation of this paper is in response to many requests for in-formation on the mining and smelting developments which have been carried on for the past three years or more by the Chromium Minin
Jan 1, 1938
-
Surface Till Geochemistry and Implications for Exploration, Black River-Matheson Area, Northeastern Ontario
By M. B. McClenaghan
"Abstract - The Matheson area of northeastern Ontario is of great interest for mineral explo ration because of its geological similarities with the adjacent Timmins, Kirkland Lake and Larder Lake gol
Jan 1, 1992
-
The Ecstall Story: Engineering & Technical Service's Department
By G. Merle, David L. McKay, Elmar Randveer
"THE ENGINEERING AND TECHNICAL SERVICES department is responsible for supplying the following services:1. Administration and co-ordination of the work required for capital projects.2. Engineering, des
Jan 1, 1974
-
A Process Flowsheet for the Extraction of Scandium from NioCorp’s Niobium / Scandium Elk Creek Deposit
By Scott Honan, Tassos Grammatikopoulos, Mike Johnson, Kelton Smith, Niels Verbaan, Ernesto Bourricaudy, Eric Larochelle, Rick Sixberry
"NioCorp is developing the niobium/scandium/titanium Elk Creek carbonatite resource deposit. The carbonatite phase contains significant niobium (0.71% Nb2O5), titanium (2.68% TiO2) and scandium (72 g/
Jan 1, 2017
-
Mining Methods at the Nickel Plate Mine
By A. Shaak
The town of Hedley is some 200 miles due east of Vancouver and lies in the bottom of the Similkameen River valley, at the junction of Twenty Mile creek, at about the 1,700-foot elevation above sea lev
Jan 1, 1946
-
Toward a unified and digital communication system for underground mines
By P. -M. Tardif, S. Outalha, R. Le
"This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system
Jan 1, 2000
-
Continuous Improvement of the Return Air Raise Silencer System at Totten Mine
By Andrew Dobson, Cheryl Allen, Enrique Acuña
"Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p
Jan 1, 2019
-
The Concentrator and Cyanide Plant of the Hudson Bay Mining and Smelting Company, Limited
By S. P. Lowe
Introduction In the following pages a general description is presented of the concentrator and cyanide plant of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, together w
Jan 1, 1935
-
The Optimization of Geochemical Exploration for Gold using Glacial Till
By M. B. McClenaghan, O. P. Lavin, Ian Nichol
"Abstract-Exploration in most areas of Canada has to contend with problems posed by glacial overburden. In many areas exploration for gold has been based on the sampling of tills, frequently by deep o
Jan 1, 1992
-
Evaluation Assessing Rock Burstability Through Mechanical Property Testing and Microscope Image Analysis
By C. D. Rowe, H. S. Mitri, J. Malki, I. Vennes
Ore extraction at great depths creates high stresses around mine openings, which can result in violent rock failure in one of various forms of strainburst. This is especially true with strong and brit
May 4, 2025
-
Newfoundland Fluorspar
By G. F. Carr
"IntroductionFLUORSPAR has been found at several •localities in Newfoundland, but all the commercial deposits discovered to date are in the vicinity of St. Lawrence, a town on the southeast coast. Mos
Jan 1, 1954
-
Online X-ray fluorescence analysis of potash materials at various stages of processing
By A. Sokolov, E. Hasikova, V. Gostilo, V. Titov
Introducing online X-ray fluorescence (XRF) analyzers in the mining and processing industries can lower costs and improve the representativeness and speed of analysis. The applicability of the CON-XTM
Jan 1, 2014
-
Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant
By Jason J. Ballentine
This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia
May 1, 2007
-
Failure and downtime reporting — A key to improve mine equipment performance
By J. Paraszczak
High productivity of the equipment employed is one of the key factors in reducing production cost in mining. One of the best ways to achieve it is an increase in availability. In order to identify the
Jan 1, 2000
-
Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting Slags
By J. Tuominen
Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G
Jan 1, 2007