Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Analysis of Particle Size Distribution in Dump Leaching Using Aerial Image Analysis and Verification by Rock Blasting Models

    By Shuo Zhang, Wenying Liu

    "In dump leaching, the efficiency of metal extraction from ores is strongly influenced by the mechanisms of fluid flow. Particle size distribution acts as a fundamental parameter in the determination

    Jan 1, 2017

  • CIM
    Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction

    By R. M. S. Häggblad

    The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de

    Jan 1, 2005

  • CIM
    A Process for Preparing Tungstic Trioxide of High Purity from a Canadian Scheelite Concentrate

    By W. A. Gow, J. A. Vezina

    "A new process for treating scheelite for the production of tungstic tri-oxide is described. The novelty of the process resides in that an ion-ex-changer is used to convert sodium tungstate to either

    Jan 1, 1966

  • CIM
    Modeling & Software for Control Purposes of a Direct Blister Smelter

    By Tuula Mäkinen, Lauri Pesonen, Peter Björklund, Jouni Pihlasalo, Mikko Korpi

    Outotec Direct Blister Flash Smelting technology has proved to be an efficient and environmentally friendly way to treat copper concentrates from the Zambian Copperbelt at Konkola Copper Mines' (

    Jan 1, 2011

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    The Utilization of High-Iron Chrome Ores

    By Marvin J. Udy

    THE preparation of this paper is in response to many requests for in-formation on the mining and smelting developments which have been carried on for the past three years or more by the Chromium Minin

    Jan 1, 1938

  • CIM
    Surface Till Geochemistry and Implications for Exploration, Black River-Matheson Area, Northeastern Ontario

    By M. B. McClenaghan

    "Abstract - The Matheson area of northeastern Ontario is of great interest for mineral explo­ ration because of its geological similarities with the adjacent Timmins, Kirkland Lake and Larder Lake gol

    Jan 1, 1992

  • CIM
    The Ecstall Story: Engineering & Technical Service's Department

    By G. Merle, David L. McKay, Elmar Randveer

    "THE ENGINEERING AND TECHNICAL SERVICES department is responsible for supplying the following services:1. Administration and co-ordination of the work required for capital projects.2. Engineering, des

    Jan 1, 1974

  • CIM
    A Process Flowsheet for the Extraction of Scandium from NioCorp’s Niobium / Scandium Elk Creek Deposit

    By Scott Honan, Tassos Grammatikopoulos, Mike Johnson, Kelton Smith, Niels Verbaan, Ernesto Bourricaudy, Eric Larochelle, Rick Sixberry

    "NioCorp is developing the niobium/scandium/titanium Elk Creek carbonatite resource deposit. The carbonatite phase contains significant niobium (0.71% Nb2O5), titanium (2.68% TiO2) and scandium (72 g/

    Jan 1, 2017

  • CIM
    Mining Methods at the Nickel Plate Mine

    By A. Shaak

    The town of Hedley is some 200 miles due east of Vancouver and lies in the bottom of the Similkameen River valley, at the junction of Twenty Mile creek, at about the 1,700-foot elevation above sea lev

    Jan 1, 1946

  • CIM
    Toward a unified and digital communication system for underground mines

    By P. -M. Tardif, S. Outalha, R. Le

    "This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system

    Jan 1, 2000

  • CIM
    Continuous Improvement of the Return Air Raise Silencer System at Totten Mine

    By Andrew Dobson, Cheryl Allen, Enrique Acuña

    "Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p

    Jan 1, 2019

  • CIM
    The Concentrator and Cyanide Plant of the Hudson Bay Mining and Smelting Company, Limited

    By S. P. Lowe

    Introduction In the following pages a general description is presented of the concentrator and cyanide plant of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, together w

    Jan 1, 1935

  • CIM
    The Optimization of Geochemical Exploration for Gold using Glacial Till

    By M. B. McClenaghan, O. P. Lavin, Ian Nichol

    "Abstract-Exploration in most areas of Canada has to contend with problems posed by glacial overburden. In many areas exploration for gold has been based on the sampling of tills, frequently by deep o

    Jan 1, 1992

  • CIM
    Evaluation Assessing Rock Burstability Through Mechanical Property Testing and Microscope Image Analysis

    By C. D. Rowe, H. S. Mitri, J. Malki, I. Vennes

    Ore extraction at great depths creates high stresses around mine openings, which can result in violent rock failure in one of various forms of strainburst. This is especially true with strong and brit

    May 4, 2025

  • CIM
    Newfoundland Fluorspar

    By G. F. Carr

    "IntroductionFLUORSPAR has been found at several •localities in Newfoundland, but all the commercial deposits discovered to date are in the vicinity of St. Lawrence, a town on the southeast coast. Mos

    Jan 1, 1954

  • CIM
    Online X-ray fluorescence analysis of potash materials at various stages of processing

    By A. Sokolov, E. Hasikova, V. Gostilo, V. Titov

    Introducing online X-ray fluorescence (XRF) analyzers in the mining and processing industries can lower costs and improve the representativeness and speed of analysis. The applicability of the CON-XTM

    Jan 1, 2014

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Failure and downtime reporting — A key to improve mine equipment performance

    By J. Paraszczak

    High productivity of the equipment employed is one of the key factors in reducing production cost in mining. One of the best ways to achieve it is an increase in availability. In order to identify the

    Jan 1, 2000

  • CIM
    Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting Slags

    By J. Tuominen

    Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G

    Jan 1, 2007