Redwood Tower; A Landmark In Deep Foundation Construction ? Synopsis
By A. Partos
It was decided to build a fourteen-storied office building over a six-storied garage and a four-storied office building. The high vertical and horizontal loads required foundations on rock approximate
Jan 1, 2010
-
Temperature, Velocity, Density, And Moisture In Drilled Shafts
By Khamis Y. Haramy
Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and
Jan 1, 2007
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice Arena
By John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi
By F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
Jan 1, 2013
-
A Geotechnical Instrumentation Case Study
By Mehih Demirkan, Kevin Tehansky
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat
Apr 1, 2023
-
Verification of Installation and Performance of ACIP Piles for Bridges
By W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay Bridge
By Saba Mohan
For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large
Jan 1, 2002
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project
By D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Design of Pile Foundations in Liquefiable, Laterally Spreading Grounds
By Arash Khosravifar
One of our research thrusts at Portland State University (PSU) centers on developing design guidelines for pile foundations in liquefiable, laterally spreading grounds. This research has been primaril
Nov 1, 2023
-
Toe Protection For H-Piles On Sloping Bedrock At Rainy River - Summary
By Jon E. Bischoff
Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi
Jan 1, 1993
-
Long, High-Capacity Ground Anchors for Soldier Pile Walls
By Bryan Bet
Retaining wall systems of soldier pile ground anchors (SPGAs) have been used for many decades to stabilize landslide activity. Due to successful use of these walls to address slope instability on the
Jul 1, 2022
-
Effect of Free Standing Height on Rock Socketed Pile under Lateral Load
By Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan
"Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o
Jan 1, 2015
-
Settlement Monitoring Of A Building Underpinned With Micropiles And Soil Nails
By Bill Zietlow
A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn
Jan 1, 2008
-
Application Of Deep Foundation Structures To Great Bridges In Vietnam
By Cau T. Bui
Thanks to Doi-moi (renovation) policy, many great bridges were constructed in Vietnam to meet demands of her booming economy in the recent decade and deep foundation structures were the only alternati
Jan 1, 2008
-
Assessment Of Safe Load On Piles Using Indian Standard Codeprivate ? Synopsis
By Shenbaga R. Kaniraj
The pile loading tests are generally conducted to assess the safe load on piles in compression. In the Indian practice, the safe load is determined using the pile loading test data and the two criteri
Jan 1, 1996
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving
By H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"
By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
Analogy Between Analyze Of Pile And Penetrometer Tip Resistance By Cavity Expansion Method
By Farhad Elmi
In this paper, a new procedure is used to find the bearing capacity of single piles and cone penetration resistance in soils. Although the procedure is mainly applicable to clay and sand using any pla
Jan 1, 2002
-
Foundation Code8 And Linit 8tatb Partial Factoring - Synopsis
By W. G. K. Fleming
The codification of foundation design and construction is a subject of extensive discussion in Europe and all current code proposals are based on limit state partial factoring. For simplicity, it is c
Jan 1, 1996
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - Synopsis
Pier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app
Jan 1, 1996