Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Performance Of Three Unique Shoring Sections For Block 75 Shoring
By Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
Operator Independent Installation Of Lime Cement (L/C) Columns
By Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000
-
SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case Study
By Scott A. Walker, Frank L. Rollo
"The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t
Jan 1, 2014
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)
By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY
By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Critical Evaluation of Indian Standard for the Design of Laterally Loaded Piles
By Sanket Rawat, Ravi Kant Mittal, Vikash Prasad
"The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p
Jan 1, 2017
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management
By Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils
By Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Excavation Support At The Capitol Visitor Center In Washington DC
By Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Piles In Peat Under Artesian Pressure: A Case Study ? Synopsis
By K. Y. C. Chung
A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga
Jan 1, 2010
-
Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.
By Peter O. Wilkinson
Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a
Jan 1, 2006
-
Ground Support And Its Toolbox
By G. Sauer
"More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava
Jan 1, 2003
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction
By Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington
By David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Downtown Seattle Transit Project - International District Station
By Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Site Management Towards Pile Execution At Qurashiya Bridge
By Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Basement Excavation: Cost Effective Retention System for a Multi Storeyed Structure
By Madan Kumar Annam, Hari Krishna Y
"Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted
Jan 1, 2015
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System
By Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization
By Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003