  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    Information Construction Technology For Supported Excavation In Urban Construction

    By Sun Jiale

    This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application

    Jan 1, 1991

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction

    By Javaid M. Alvi

    This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece

    Jan 1, 2001

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    A New Diaphragm Wall Technology Providing Mechanical And Watertightenss Continuity

    By P. Dupeuble

    Diaphragm walls, owing to their method of construction are discontinuous structures. A new technology for the construction of joints between panels has been developed. This new process allows for the

    Jan 1, 2010

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000

    By Jean-Pierre Hamelin

    Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper

    Jan 1, 2000

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • DFI
    The Application Of The Caisson In China

    By Chen Xizhe

    The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c

    Jan 1, 1991

  • DFI
    Experiences With Deep Foundations In Shanghai - Synopsis

    By Y. X. Tong

    The simplicity off Ø=0 analysis has been taken advantage of to evaluate the geotech­nical problems of open caissons, slurry trench walls and piles in Shanghai. Undrained shear strengths obtained by va

    Jan 1, 2010

  • DFI
    Driven Piles

    By S. Merjan

    Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf

    Jan 1, 1991

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989

  • DFI
    Diaphragm Wall Construction In Hong Kong

    By Arturo Ressi di Cervia

    The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job

    Jan 1, 1993

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration Standards

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and

    Jan 1, 2014

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • DFI
    Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? Introduction

    By Richard Short

    Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l

    Jan 1, 2007

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic