  • DFI
    Maritime Structures

    By D. Waite

    The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff

    Jan 1, 1991

  • DFI
    Permanent Displacement And Pile Driving Vibrations - Summary

    By Charles H. Dowding

    Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta

    Jan 1, 1991

  • DFI
    Modelling For Consolidation Around The Pile Tip

    By Emöke Imre

    A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical

    Jan 1, 2002

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Accessories For Driven Piles ? Synopsis

    By H. W. Hunt

    Accessories are increasingly used to protect and extend H, pipe, precast concrete, timber, and sheet piles for any soils conditions. With point protection, piles can be driven through boulders, layere

    Jan 1, 2010

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Practical Aspects Of Compensation Grouting ? Synopsis

    By Philip J. H. Ball

    The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial

    Jan 1, 2000

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Fundamental Tests On The Performance Of High Capacity Pin PilesSM

    By Donald A. Bruce

    Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho

    Jan 1, 1993

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • DFI
    Practical Soil Nail Wall Design And Constructability Issues

    By Walter G. Kutschke

    Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us

    Jan 1, 2007

  • DFI
    Tentative Guidelines For Design Of Stone Columns- G. H. Approach - Synopsis

    By A. R. Katti

    The stone columns are widely used in the improving the bearing capacity of weak soils mostly for supporting flexible foundation systems. The load carrying capacity of a stone column is complex in natu

    Jan 1, 1996

  • DFI
    The Use Of Micropiles In Estonia

    By T. Ruben

    Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.

    Jan 1, 2000

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • DFI
    Application Of Hydrofracture Principles To Grouting In Deep Foundation ? Synopsis

    By Z. M. Zhang

    Fracture grouting is a particular technique which can be used in soils and rocks with low permeability to increase groutability and penetration rates and to solve some special foundation problems by i

    Jan 1, 2010

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987