Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
DC Arc Smelting Of Silicon: Is It Technically Feasible?By M. Abdellatif
Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p
Jan 1, 2011
-
Slope Management At Navachab Gold Mine, NamibiaBy Frik Badenhorst, René Roux, Peter Terbrugge
This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.
Jan 1, 2006
-
Limestone quarry quality optimization for a cement factory in Turkey - SynopsisBy A. H. Onur
Many factors govern the size and shape of an open pit, and these must be properly understood and used in the short and long-term planning of any open pit and quarrying operation. The importance of eac
Jan 1, 2008
-
In Search Of Low Cost Titanium: The Fray Farthing Chen (FFC) Cambridge Process - SynopsisBy S. J. Oosthuizen
This article explores the Fray Farthing Chen (FFC) Cambridge process, a novel method for the electrochemical deoxidation of metal oxides in molten salt, discovered at the University of Cambridge in 19
Jan 1, 2011
-
Production Of Titanium Metal Powder By The HDH Process - SynopsisBy X. Goso
Laboratory-scale tests were conducted at Mintek for the production of titanium powder from particulate Kroll sponge by the hydrogenation-dehydrogenation (HDH) process. The aim of this work was to prod
Jan 1, 2011
-
Engineers For The 21st Century - Minerals And Metals IndustryBy P. J. Knottenbelt
Outcomes from a workshop organized through the SAIMM revealed that the minerals and metals industry must develop its ?Engineering Team? if it is to continue to meet the challenges of globalization. Th
Jan 1, 2002
-
Burning pyrites compared to sulphur ? SynopsisBy W. V. Mutler
Present day capital costs are analysed for a 2 000 metric tonne per day (MTPD) pyrite burning plant and compared with a sulphur burning plant of the same capacity. Power, raw material and steam produc
Jan 1, 2009
-
Design Principles for Optimizing an Established Survey Slope Monitoring SystemBy N. Mphathiwa
When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th
Jan 1, 2014
-
The ROMA Project (Resource Optimization And Recovery In The Material Industry) ? A Typical Cooperation Project In NorwayBy M. Tangstad
Keywords: Pyrometallurgy, ROMA, Norway, furnace, fines The ROMA project is a competence project on optimizing the usage of raw materials and energy in the ferromanganese, silicon, and aluminium in
Jan 1, 2011
-
Designing exploitation and dumping processes in brown coal mines using information technology techniquesBy R. Chryst, R. Kus
In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining
Jan 1, 2003
-
Survey Slope Stability Monitoring: Lessons From Venetia Diamond MineBy F. T. Cawood, M. A. Jooste
This paper describes the survey monitoring processes at Venetia, which are discussed under visual inspections, ad hoc investigations, system monitoring and slope stability radar monitoring. This is fo
Jan 1, 2006
-
Witwatersrand Gold Reef Evaluation: The ?Variancegram? ToolBy C. Lemmer
The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures
Jan 1, 2014
-
A Model For Direct Dragline Casting In A Dipping Coal-SeamBy B. Erdem
This article introduces a computer model, which emphasizes panel design for draglines deployed in direct side-casting mode. The study covers flat and inclined coal-seam conditions with the dragline op
Jan 1, 2004
-
Solvent extraction design consideration for the Tati Activox® plant - SynopsisBy E. Robles
The Tati Activox® Project (TA®P) is the first step towards the implementation of the Norilsk Nickel Activox® process. The ultrafine grinding (UFG) and autoclave pressure leach process conditions are t
Jan 1, 2009
-
Reconstruction time of a mine through reliability analysis and genetic algorithms - SynopsisBy M. Kumral
A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl
Jan 1, 2009
-
Use of Geostatistical Bayesian Updating to Integrate Airborne Radiometrics and Soil Geochemistry to Improve Mapping for Mineral ExplorationBy J. M. McKinley
Mineral exploration programmes around the world use data from remote sensing, geophysics, and direct sampling. On a regional scale, the combination of airborne geophysics and ground-based geochemical
Jan 1, 2014
-
Stability Considerations for Slopes Excavated in Fine Hard Soils/Soft Rocks at Cobre Las Cruces Mine, Sevilla, SpainBy J. M. Galera, M. D. Rodriguez, V. Pozo, S. Cooper
"Cobre Las Cruces mine extracts copper minerals from a VMS deposit located in the well-known Iberian Pyrite Belt (IPB). As an open pit, it is distinguished geologically from other IPB mines by the pre
Jul 1, 2019
-
Elution behaviour of metals from carbonBy M. Jeffrey
This study investigated the elution of precious and toxic metals from activated carbon. Gold and mercury are of primary interest, due to their value and environmental impact respectively. A laboratory
Jan 1, 2009
-
An effective face support system to minimize rockfalls - SynopsisBy N. D. L. Burger
An effective prototype face support system to minimize rockfalls in rockfall-prone mines was developed and patented during a project sponsored by the Mine Health and Safety Council (MHSC). An experime
Jan 1, 2008
-
Shear-bond strength testing of thin spray-on liners - SynopsisBy H. Yilmaz
A testing method for assessing the shear-bond strength of thin spray-on liner (TSL) on rock substrate was developed at Wits University Rock Mechanics Laboratories. The gap between a 20 mm thick steel
Jan 1, 2007