Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use Of Geographical Information Systems In The Integration And Visualization Of Mining DataBy S. J. C. L. Peeters
Geographical information systems (GISs) provide sophisticated functionalities t1tat can be used by the personnel in many aspects of the mining industry to visualize, analyse, and manipulate spatial an
Jan 1, 1996
-
A new approach to mine accident analysis: a case study of a mine cave-in - SynopsisBy D. E. Sweeney
In May of 1980, a mine operated by Belmoral Mines Ltd experienced a failed crown pillar, resulting in the death of eight miners and putting sixteen others in harm?s way. The Ferderber mine was located
Jan 1, 2007
-
The Effect on the Production of Bantu, Engaged on Tram-Shovelling, of Different Temperature ConditonsBy J. H. Viljoen, J. F. Morrison, C. H. Wyndham
SYNOPSIS Heart rates, oral temperatures, shovels/min and number of 3/4 ton cars/hour trammed over distances of up to 350 ft were measured in samples of 6-10 miners, engaged in tram-shovelling, at 76°
-
A Perspective Of Marine Mining Within De BeersBy K. Richardson
Although the De Beers group has a long history of placer mining on land, the group only became actively involved in deep water marine diamond exploration and mining in1983 with the formation of De Bee
Jan 1, 2007
-
The Effect Of Backfill On The Transmission Of Seismic EnergyBy S. M. Spottiswoode
Rock mechanics benefits of stope support in deep-level mining originate principally from the ability of the support to resist relative movements between the hangingwall and the footwall. While the rol
Jan 1, 1988
-
A matched case-control study of occupational injury in underground coalmine workers - SynopsisBy B. M. Kunar
It is well known that job-related hazards and individual factors influence occupational injuries. However, research involving coalminers has been limited. This case-control study assessed the relation
Jan 1, 2010
-
Distributed antenna system as an underground communication backboneBy S. R. Stadler
Koffiefontein Mine commissioned a distributed antenna system as an underground communication backbone for the DISPATCH® production management system during September1999. STAS Ltd, the supplier of the
Sep 1, 2001
-
Comparing different methods of sampling to estimate the mineral resource in the Elizabeth Bay aeolian diamond placerBy J. U. Burger
The Elizabeth Bay aeolian deposit in Namibia comprises a sedimentary package of diamondiferous grits that have been deposited, reworked and concentrated to various degrees by dominant southerly winds.
Jan 1, 2009
-
Application of Geometallurgical Modelling to Mine Planning in a Copper-Gold Mining Operation for Improving Ore Quality and Mineral Processing EfficiencyBy C. Musingwini, C. Beaumont
"Kansanshi mine, located in northwestern Zambia, uses conventional openpit mining to produce primarily copper, with gold as a by-product. The ore is extracted from a deposit with highly complex minera
Mar 1, 2019
-
Recovery Of Zircon From Sattankulam Deposit In India - Problems And ProspectsBy S. Asokan, Ch. V. G. K. Murty, R. Upadhyay
Zircon (ZrSiO4) is the most frequently found zirconium ore occurring in heavy mineral sands, from which it is extracted as a co-product in the production of ilmenite and rutile. Estimated world reserv
Jan 1, 2007
-
Recommissioning A Two-Km Long Waste Mica Slurry PipelineBy P. Harris, N. Heywood
An existing 1 800 m long pipeline, which carried waste mica slurry from kaolin processing, is to be recommissioned. The mica solids throughput is to be substantially increased from 5.2 t/h up to a max
Jan 1, 2007
-
Project Success And Performance EvaluationBy R. G. Koelmans
In 2001 Platinum overtook gold in foreign revenue earnings for South Africa. The export sales from platinum group metals amounted to R29.3 billion as opposed to gold export sales of R28.6billion1. O
Jan 1, 2004
-
Technical Note - The Influence Of Binder Addition On The Hydraulic Transportation Of Backfill Containing Full Gold-Plant TailingsThe addition of binder to full plant tailings significantly affects the rheology of a backfill mixture and, consequently, the pressure gradients in the pipeline. The binder increases the yield stress
Jan 1, 1993
-
Trials on blindhole boring in South African gold minesBy W. J. Van Den Berg, J. G. Taylor
The paper discusses the introduction of blindhole boring on the South African gold mines of Anglo American Corporation. It covers the boring trials conducted, and outlines the progress made in the dev
Jan 1, 1978
-
The effect of particle sizes and solids concentration on the rheology of silicas and based suspensions - SynopsisBy N. Mangesana
The effect of high solids concentration and coarse particle sizes (d50 ranges 90?300 µm) on the viscosity of a suspension of water and silica sand was investigated. The experiments were designed to in
Jan 1, 2008
-
Visit to Prieska Copper Mines (Pty) LtdOn 8th August, 1973, 57 members of the Institute visited Prieska Copper Mine at Copperton in the North Western Cape. After tea, the group was welcomed by the Management of the Mine, and Mr Grobler,
Jan 10, 1973
-
The Clean-Up Of The Plant At Bracken Gold MineBy M. A. de Ruijter
Bracken Gold Mine ceased mining operations during February 1993. The clean-up of the gold plant, which had already commenced in September 1992, was completed in January 1994. The mine had been in prod
Jan 1, 1996
-
Book news1. Book review Gold and silver handbook: On geology, exploration, production, economics of large tonnage, low grade deposits, published by S.W. Ivosevic. 227 pp. $29.50 + 3.25 for shipping and handlin
Jan 1, 1985
-
The improved rate of stope-face advance at Buffelsfontein Gold Mining Company LimitedBy B. P. Christos
The improved rate of stope-face advance at Buffelsfontein Gold Mining Company Limited by B. P. CHRISTOS (Associate) To achieve a higher rate of stope-face advance. it was necessary to examine al.1aspe
Jan 12, 1975
-
A Spatial Mine-to-Plan Compliance Approach to Improve Alignment of Shortand Long-Term Mine Planning at Open Pit MinesBy T. J. Otto, C. Musingwini
"The objective of any mining company is to sustainably maximize the net present value (NPV) throughout the life-of-mine (LOM). The expected NPV over the LOM is calculated based on a mine plan, yet the
Mar 1, 2019