Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine

    By J. B. Lizak

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    Shear Strength Characteristics of Soft Rock Joints Based on Constant Normal Stiffness Testing

    Large-scale shear apparatus is designed to investigate the shear hehaviour of simulated soft rock joints under constant normal stifmess condition. Regular saw-teeth profiles having inclinations betwee

    Jan 1, 1997

  • SME-ICGCM
    A Retrospective on LaModel (Or Dr. Heasley?s Wild Ride)

    By Keith Heasley

    This paper is a retrospective on the development, application, and enhancement of the LaModel program from a personal perspective. The narrative starts with an explanation of the objectives behind the

    Jan 1, 2011

  • SME-ICGCM
    Roadway Strata Management in the New South Wales Underground Coal Mining Industry

    By Rob Thomas

    Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp

    Jan 1, 2007

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Field Measurements of Overburden and Chain Pillar Response to Longwall Mining

    By Daniel W. H. Su

    Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main

    Jan 1, 1987

  • SME-ICGCM
    Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story

    By Michael Gauna, Christopher Mark

    "For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like

    Jan 1, 2016

  • SME-ICGCM
    Presented at the 25th International Conference on Ground Control in Mining

    By David Dye

    Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou

    Jan 1, 2007

  • SME-ICGCM
    Numerical Modeling of the U1A Complex at the Nevada Test Site: Model Development and Comparison of Different Drift Mining Options (9c46cc37-c6f9-43fc-b6b3-b63cc79f203c)

    By R. Karl Zipf

    Stress analysis programs such as MULSIM/NL, LAMODEL, MinSim 2000, and EXAMINE TAB are used in the mining industry to analyze stresses and displacements in coal mines, platinum mines, gold reefs, and t

    Jan 1, 2003

  • SME-ICGCM
    Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004

    By Lewis Dr. Wade

    It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO

    Jan 1, 2005

  • SME-ICGCM
    Laboratory Study Of Shear Loading And Bolt Load Transfer Mechanisms Under Constant Normal Stiffness Conditions

    One of the most important parameters in rock/resin/bolt load transfer mechanism is the surface property of the bolt. Although there are various bolt surface configurations available in the market, ver

    Jan 1, 1999

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    Effects of Overburden Characteristics on Dynamic Failure in Underground Coal Mining

    By Douglas Tesarik, Mark K. Larson, Habte Abraham, Heather E. Lawson

    Dynamic failures, or "bumps", remain an imperative safety concern in underground coal mining, despite significant advancements in engineering controls. While many factors have been empirically linked

    Jan 1, 2016

  • SME-ICGCM
    Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover

    By David F. Gearhart

    A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha

    Jan 1, 2014

  • SME-ICGCM
    Application of Phenolic Foam in Longwall Mining

    By Marc Arl

    Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro

    Jan 1, 2005

  • SME-ICGCM
    Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures

    By Arka Jyoti Das, Prabhat Kumar Mandal

    "Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv

    Jan 1, 2016

  • SME-ICGCM
    Geotechnical Considerations in Highwall Mining Applications in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Kikuo Matsui, Hideki Shimada

    "Indonesia is the second largest coal exporter to Japan. Almost all the coal is produced from open cut mines. However, a great deal of coal is left in the highwalls of the mined-out pits. The use of h

    Jan 1, 2010