Search Documents

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    Accurately estimating heat load from conveyed rock

    By M A. Tuck

    The dominant heat loads in a deep underground mine are the surrounding rock mass, autocompression and machinery. In addition heat can be contributed to by other sources. Many block cave, sublevel cave

    Aug 28, 2017

  • SME
    Ace Hydrocyclone: A Fast Froth Cyclonic Beneficiation Technology For Fine And Ultrafine Minerals - SME Annual Conference 2023

    By H. Fayed

    Froth flotation technology is the backbone of the minerals pro-cessing industry where minerals are concentrated by selective separa-tion; either direct or in-direct flotation. In direct flotation usef

    Feb 1, 2023

  • SAIMM
    Achievable Combustion Efficiency With Alstom CFB Boilers For Burning Discarded Coal - Synopsis (The Journal of The Southern African Institute of Mining and Metallurgy)

    By P. Gauvillé

    The key driver for choosing a circulating fluidized bed (CFB) boiler is the ability to burn a wide range of fuels with highly efficient combustion while meeting low emission requirements. Reduced sorb

    Jan 1, 2012

  • SAIMM
    Achievable Combustion Efficiency With Alstom CFB Boilers For Burning Discarded Coal ? Synopsis

    By P. Gauvillé

    The key driver for choosing a circulating fluidized bed (CFB) boiler is the ability to burn a wide range of fuels with highly efficient combustion while meeting low emission requirements. Reduced sorb

    Jan 1, 2012

  • CIM
    Achievement of High Energy Efficiency in Grinding Mills at Santa Rita

    "Horizontal grinding mills have been used in the mining industry for more than a century, and due to their operational and maintenance simplicity they remain a widely used technology for various stage

    Jan 1, 2013

  • IMPC
    Achievements and challenges for Gold Fields in the Americas in its operations and in the development of projects

    By Manuel Diaz

    "In these difficult times for the mining world, mainly due to the global uncertainty about metal prices and the increased activity of opponents to the mining industry, it is essential that mining comp

    Jan 1, 2014

  • AUSIMM
    Achievements in Mine Water Management and Research General Report

    Seven papers included in Session 8 of the Third International Mine Water Congress under the heading "Achievements in Mine Water Management & Research" have been reviewed. Only one paper, a case stud

    Jan 1, 1988

  • CIM
    Achieving 15% Productivity Improvement with the Intellimine System and Change Management Services

    By Chigova. Terence

    In 2008, Anglo installed the Modular IntelliMine® System at its Kleinkopje Mine (AKK). As part of this deployment, Anglo also used the Change Management Consulting Service offered by Modular to ensure

    May 1, 2010

  • AUSIMM
    Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USAÆs Most Productive Coal Mines

    By Kissell F. N, Volkwein J. C

    The U.S. Department of Interior's Bureau of Mines has the opportunity to visit many U.S. mines, including some that claim 2 to 5 times the national average of 334 raw tonnes/unit shift (tps)

    Jan 1, 1988

  • SME
    Achieving A Dry Tunnel

    By Vernon K. Garrett, Gerhard Sauer

    INTRODUCTION Generations of tunneling engineers had to fight not only against bursting rock and squeezing ground but also against the destroying power of water. Intrusion of groundwater into the

    Jan 1, 1987

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • AUSIMM
    Achieving an Environmentally Sustainable Stream Diversion Design in an Opencast Mining Area

    Solid Energy New Zealand Limited owns and operates the Ohai coal field (Wairaki Coal Mining Licence, CML) in western Southland. The Morley Stream passes directly through the middle of the CML and has

    Jan 1, 2005

  • AUSIMM
    Achieving Better Mine Closure Outcomes for Less Money

    By B Howard, M Jones, D Pershke

    "Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r

    Jul 16, 2014

  • CIM
    Achieving business results through IT: Insuring controller performance benefits with web-enabled monitoring at Noranda

    By L. Lariviere, M. Grenier, R. Khalili, D. Shook

    A mineral processing facility near Montreal, CEZinc, Noranda Inc., has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition

    Jan 1, 2003

  • CIM
    Achieving effective telerobotic control of industrial equipment

    By Derrick Hunter, Pat Feighan, Keith Chrystall, David Wells

    "Equipment which may be remotely operated, has some degree of on-board intelligence, and which for periods of time may operate autonomously, is referred to as telerobotic. Recent advances in electroni

    Jan 1, 1996

  • AUSIMM
    Achieving High Flotation Recoveries from Browns Polymetallic Ore

    By G Hayes

    Ore from the Browns deposit near Batchelor, in the Northern Territory of Australia, is a fine-grained polymetallic sulfide ore hosted in graphitic black shale. Minerals of economic significance are se

    Jan 1, 2002

  • AUSIMM
    Achieving Internationally Competitive Rail Freight for Coal - The Hunter Valley Rail Project

    The Hunter Valley Rail Project (HVRP) represents most of the coal producers using the Hunter Valley Rail System in NSW to haul coal to the port of Newcastle. This system carries over 70 per cent of

    Jan 1, 1995

  • SME
    Achieving longer pull using newly developed Pentadyne-HP explosive - SME Transactions 2010

    By A. Sinha, C. Sawmliana, P. Pal Roy

    Using the newly developed and permitted explosive Pentadyne-HP (Gulf Oil Corporation Ltd., Hyderabad), the Blasting Department of the Central Institute of Mining and Fuel Research, Dhanbad experimente

    Jan 1, 2010