Search Documents

  • DFI
    Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction

    By Javaid M. Alvi

    This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece

    Jan 1, 2001

  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • DFI
    Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling Practice

    By Willie M. NeSmith

    Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev

    Jan 1, 2006

  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • DFI
    Augered Pile World Record Depth within a Soil Mix Basement

    By Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt

    The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo

    Jan 1, 2019

  • DFI
    Augered Pressure Grouted Piles In Complex Glacial Soils - A Case Study - 1. Introduction

    By Peter J. Jancich

    This paper describes the installation of high capacity Augered Pressure Grouted piles which support structural loading from a four level parking garage in west-central DuPage County, Illinois. The sub

    Jan 1, 1991

  • SME
    Augment Technologies - An Update

    By Wade N. Ellett, K. Marc Le Vier, Timothy A. Fitzpatrick, Kenneth A. Brunk

    As the gold mining industry matured through the 1980' s, and into the 1990's, the development of refractory gold orebodies has become more prevalent. Newmont Mining Corporation developed and commercia

    Jan 1, 1997

  • AIME
    Augmentation of Small-Hole Rock Drilling with Water Jets

    By John R. M. Hill, Gerald Zink, Fun-Den Wang

    The work described in this paper is sponsored by the Bureau of Mines for the purpose of accelerating the drilling of roof bolt holes and reducing the quantity of materials needed to fill each hole. A

    Jan 12, 1979

  • SME
    Augmentation Of Small-Hole Rock Drilling With Water Jets

    By Gerald Zink

    The work described in this paper is sponsored by the Bureau of Mines for the purpose of accelerating the drilling of roof bolt holes and reducing the quantity of materials needed to fill each hole. A

    Jan 1, 1978