Search Documents

  • ISEE
    Back to School on Construction Blasting, Rules of Thumb Revisited

    By Jerry Wallace

    Construction of a new grammar school required blasting within three meters of the existing school. Due to changes not anticipated at time of bid opening, blasting had to take place while approximately

    Jan 1, 2001

  • CIM
    Back to the Basics in Process Control

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "A major thrust in industrial automation over the past few years has been the exploration and incorporation of higher level (supervisory and optimizing) control strategies aimed at more fully exploiti

    Jan 1, 1998

  • SME
    Back To The Basics In Process Control (bf65ca3d-296a-41ae-b421-98a0cdd41f9f)

    By A. Vien

    A major thrust in Industrial automation over the past few years has been the exploration and incorporation of higher level (supervisory and optimizing) control strategies aimed at more fully exploitin

    Jan 1, 1998

  • ISEE
    Back to the Basics: Electronic Detonators

    By Larry Schneider

    In recent years, many individuals looking into the future of the blasting industry have predicted that the most likely next technological breakthrough would be the use of high precision, digitally con

    Jan 1, 2006

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems Part 2: Safety Considerations

    By Larry Schneider

    "0 ne of the incentives that led to the development of non-electric shock tube initiation systems was the desire within the industry to improve detonator safety. And to the extent that nonelectric ini

    Jan 1, 1995

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • IOM3
    Back to the future

    By G W. Clamp

    The most traum atic event within the lUK coal industry during the last 30 years was its privatisation. Who were the relatively unknown people from RJB: white knights or robber barons? This paper highl

    Jan 8, 1997

  • AUSIMM
    Back to the Future - Why Change Doesn't Necessarily Mean Progress

    By P A. Tilyard

    There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation

    Jan 1, 2009

  • IIMP
    Back to the Future: Geologic mapping provides the framework to validate and integrate data from new exploration tools

    By Andreas Dietrich

    The development of new techniques in mineral exploration seems to reduce the need of geological field work and mapping: Data collection can now be done remotely by satellites, drones, and tablet-equip

    May 10, 2023

  • CIM
    Back-Analyses of Failures and Support Redesign of a Magnesite Roomand-Pillar Mine Excavated in Stratified Rock

    By J. Arzúa, L. R. Alejano, P. Rodríguez

    "After six years of successful excavation with a support pattern, some roof failures have happened in a room-and-pillar underground mine excavated in a stratified rock mass. In this paper the authors

    Jan 1, 2015

  • SME
    Back-Analysis Of Stresses Associated With Longwall Face Bursts At The Deer Creek Mine Energy West Mining Company, Utah

    By J. F. T. Agapito

    Experience at Energy West Mines in the Wasatch Plateau Coal Field, Utah, has shown that longwall face bursts occur mostly near the tailgate when extracting the third adjacent longwall in a panel secti

    Jan 1, 1997

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • IMMS
    Back-arc Rifting and Formation of the Hydrothermal Ore Deposits at the Northern Izu-Ogasawara Arc in the Western Pacific

    By E. Moriguchi, K. Tamaki, A. Okuda, K. Iizasa, C. Honsho

    The northern Izu-Ogasawara Arc is characterized by an abundant distribution of submarine calderas along the volcanic front to the back-arc rift zones. In many of these calderas hydrothermal activities

    Sep 24, 2006

  • DFI
    Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic Loading

    By Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert

    The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines

    May 1, 2022

  • AIME
    Backed -up Mills for Continuous Rolling (9074a620-ca34-45ad-8565-fdf285a1e900)

    By Howard Talbot

    THE history of the development of the strip in- dustry, mentioned in this paper, was covered in considerable detail by Stephen Badlam in his paper presented. before the American Iron and Steel Insti

    Jan 5, 1928

  • AIME
    Backed-up Mills for Continuous Rolling

    By Lloyd Jones

    THE strip industry made rapid strides in regard to both width and gage until about 1922, when the maximum width was about 20 in. In the hot mills, strips of thin gages in wide widths could be pro-duce

    Jan 3, 1928

  • SME
    Backfill - Whatever it takes

    By Dan Kump

    This paper provides an overview of Barrick Gold's Bullfrog underground mine backfill program. The Bullfrog underground mine was a gold mine that primarily used the underhand cut-and-fill mining m

    Jan 1, 2002

  • SME
    Backfill -- Whatever It Takes (55c598fa-a68c-4837-a73c-9de81a01def4)

    By D. Kump

    The Bullfrog Mine is an underground goldmine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999

    Jan 1, 1999

  • SME
    Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)

    By D. Kump

    The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.

    Jan 1, 1999

  • AUSIMM
    Backfill Alternatives for Regional Support in Ultra-Depth South African Gold Mines

    By G York

    South African gold reserves extend to great depths. However, strategies for the mining of such deposits have changed only slightly over the past number of years. Regional support at depth is currently

    Jan 1, 1998