Search Documents

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    Blasting Parameters for Concrete Fly-Overs

    By Bob de Raadt

    The main problem in blasting a fly-over spanning a main road is the brief time available for blasting and the removal of the debris, in order to minimize the ensuing traffic disruption in the public h

    Jan 1, 1984

  • ISEE
    Blasting Permanently Frozen Asbestos Ore in Northern Canada

    Almost one half of Canada's total land surface is underlain by permafrost. This term describes the thermal condition of earth materials when their temperature remains below 0°C continuously for a numb

    Jan 1, 1975

  • AUSIMM
    Blasting Physics-What the Operator Can Use in 1975

    Blasting effectiveness must be gauged by total production costs. ANFO charges made up in polythene "sausages" are not as profitable as is indicated by the price of ANFO. All-slurry charges are wa

    Jan 1, 1975

  • CIM
    Blasting Practice in the East Bluff Section of the Britannia Mine

    By Chris G. Dobson

    Introduction The Britannia mine is at Britannia Beach, on Howe sound, approximately thirty miles from Vancouver. The first claims were staked in 1898, and a local company was formed at that time to d

    Jan 1, 1935

  • SME
    Blasting Practices At Die Mining Company

    By Edward J. Karkoska

    The film you see is a slow motion view of a typical half million ton taconite blast at one of Erie's mines. This blast is made up of 220 drill holes and a total of 325 thousand pounds of blasting

    Jan 1, 1969

  • SME
    Blasting Practices At The Cannon Mine

    By C. J. Gilbert

    The mining method at the Cannon Mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill prior to pillar removal. The dimensions of the pillars, 24 feet w

    Jan 1, 1989

  • ISEE
    Blasting Practices at the Fording River Operations

    By Murray B. Lytle

    The Fording River Operations of Fording Coal Ltd. in southeastern British Columbia is producing 45 million long tons of clean metallurgical coal for shipment to the Japanese steel industry on a 15 yea

    Jan 1, 1978

  • AIME
    Blasting Practices At The New Cornelia Open-Pit Copper Mine

    By Harry H. Angst, Reuel A. Cochrane

    THE successful exploitation by opencut methods of the low-grade porphyry copper deposits is due to the economical handling of large tonnages. Large tonnages are possible only if the rock material is b

    Jan 1, 1941

  • AIME
    Blasting Practices for Improved Coal Strip Mine Highwall Safety and Cost

    By Michael F. Dunn, Francis S. Kendorski

    The fall of rock from strip coal mine highwalls continues to be the largest single source of fatal accidents, so methods to improve highwall stability through improved blasting practices were investig

    Jan 1, 1983

  • CIM
    Blasting Practices in Some Coal Mines of Nova Scotia

    By L. H. Bergmann

    THE blasting practices described are fairly representative of those employed in the coal mines of Eastern Canada. As such, they may be of interest to Western Canadian coal mine operators. The treatmen

    Jan 1, 1945

  • SME
    Blasting Practices Updated at Cannon Mine

    By Clark J. Gilbert

    The mining method at the Cannon mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill before pillar removal. The dimensions of the pillars are 7.3 m wi

    Jan 1, 1990

  • ISEE
    Blasting Problems Facing the USA Quarry Industry

    By Victor C. Bryan

    "One of the more challenging issues facing operators of U.S. mines and quarries is blasting in an environmentally acceptable way. It is quite important that industry management understand and apply gu

    Jan 1, 1995

  • ISEE
    Blasting Procedures at the Republic Mine

    By R C. Berglund

    Since the Republic Mine began production in the mid 1950's, drilling and blasting practices have continually changed. In recent years, progress has been achieved through the development of more precis

    Jan 1, 1980

  • ISEE
    Blasting Procedures at Woodville Lime and Chemical Company

    By Calvin J. Konya

    The Woodville Lime and Chemical Company Limestone Quarry is located in Sandusky County, Ohio. Fifty years ago, when quarrying began, it was situated approximately two miles from the town of Woodville.

    Jan 1, 1977

  • ISEE
    Blasting Procedures, Veterans Administration Medical Center, Birmingham, Alabama

    By Beau Bryson, Tony Cooley

    The following paper is a technical discussion depicting the type of blasting procedures used to control vibration levels. The blast vibration control criteria that was established and the type of moni

    Jan 1, 1985

  • ISEE
    Blasting Program Optimization with Emphasis on the Control of Blast Vibration and Airblast

    By Frank Sames

    Most Blasting Programs are developed focussing on the environmental impact with respect to blast vibration and airblast. Compliance with existing regulations or policies limiting the immissions are ge

    Jan 1, 2000

  • ISEE
    Blasting Related Aggregate Size Optimization

    By John Cory, Ran Tamir

    Blasting data analytics are being increasing used to increase mining productivity, reduce mining costs, maximize high margin aggregate products, and to reduce fines. Three examples will be illustrated

    Jan 1, 2012

  • AUSIMM
    Blasting related indices as the key to underground blasting improvements in a challenging rock mass

    By J Jackson, E Sellers

    Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto

    Oct 16, 2017

  • AIME
    Blasting Research At The Mines Branch

    By R. F. Favreau, G. E. Larocque

    The objective of the study is development of an analytic process based on rock and explosive properties which allows the prediction of the stress distributions and fracture zone around explosive charg

    Jan 1, 1971