Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case History Of The Juniper Prospect
By S. H. Ward, R. A. Barker
THE Juniper Prospect is in Carleton County, N. B., at approximately 46º 31' north latitude, 67º 20' west longitude. During the summer of 1955 an area in west-central New Brunswick was sele
Jan 1, 1958
-
Case History of the New St. Clair River Tunnel
By J. F. McDonald
On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun
Jan 1, 1995
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase III
By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal Stress
By D. Oyler
The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations
By Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station
By Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC
By Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Case History Of The Wachovia?Knight Theater Pedestrian Tunnels
By Eric Eisold
The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California
By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA
By Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
Case history on the reduction of chlorides from mine water
By Kathleen Lagnese, Srikanth Muddasani, Kashi Banerjee, Carla Robinson
"Mine water generated from underground coal mining operations contains both dissolved and particulate solids. Dissolved solids primarily consist of sodium, calcium, magnesium, potassium, chlorides and
Jan 1, 2014
-
Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure
Jan 1, 2015
-
Case History: Foundations For The New Mississippi River Bridge, St. Louis
By Paul J. Axtell
This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c
Jan 1, 2011
-
Case History: Multiple Axial Statnamic Tests On A Drilled Shaft Embedded In Shale
By Paul J. Axtell
Two new railroad bridges in Kansas City, Missouri are founded on drilled shafts embedded into the soil and underlying shale. The uncertainty arising from the non-homogeneous, anisotropic nature of mo
Jan 1, 2006
-
Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal
By Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
Case History: Chile - One Nation Where Nationalism And Foreign Investment Are Reconciled
By Eric N. Baklanoff
A major problem whose importance touches the entire underdeveloped world is how to reconcile the demands of nationalism with the requirements of the international economy. Chile's copper industry
Jan 8, 1968
-
Case History: Comparison of CSL Results to Physical Observations
By David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy
By Roberto Folchi
This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel
Jan 1, 1994
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis
By Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada
By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak
"The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.
Jan 1, 2017