    Case Studies Of Depillaring Under Special Strata And Mining Conditions

    By P. R. Sheorey

    Four case studies of special geomining conditions from Indian coalfields are discuss- ed. These cases relate to (a) pillar extraction in two seams simultaneously under a difficult roof (Satpura I and

    Jan 1, 1988

  • DFI
    Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway Upgrade

    By Henry Zhang

    This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re

    Nov 1, 2022

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • AUSIMM
    Case Studies of International Copper Development Projects

    By Pollack B

    Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th

    Jan 1, 1983

  • SME
    Case Studies Of Long-Term Methane Extraction From Coal

    By M. A. Trevits

    The explosion hazard presented by methane gas in coal is confronted daily in the mining industry. Research has developed several viable methods for gas control in addition to conventional dilution by

    Jan 1, 1985

  • IMPC
    Case Studies of Models of Tube Mill and Air Separator Grinding Circuits

    By A. J. Lynch, L. Ergun, M. Oner

    "A research program on modelling cement grinding circuits has been in operation at Hacettepe University, Ankara, for four years. It has concentrated so far on tube mill and air separator grinding circ

    Jan 1, 2003

  • IMPC
    Case Studies of Models of Tube Mill and Air Separator Grinding Circuits (ABSTRACT PAGE)

    By A. J. Lynch, L. Ergun, M. Oner

    "A research program on modelling cement grinding circuits has been in operation at Hacettepe University, Ankara, for four years. It has concentrated so far on tube mill and air separator grinding circ

    Jan 1, 2003

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000

  • SAIMM
    Case Studies Of Simultaneous Mining And Mineral Processing Optimization Applied To Platinum And Nickel Operations

    By S. Burks

    This paper develops the themes explained at the previous SAIMM Platinum conference by Whittle and Burks1. Optimization techniques can be used to significantly increase the value of mining businesses b

    Jan 1, 2012

  • SAIMM
    Case Studies Of Simultaneous Mining And Mineral Processing Optimization Applied To Platinum And Nickel Operations ? Synopsis

    By S. Burks

    This paper develops the themes explored by the authors at the Fourth International Platinum Conference,. Optimization techniques can be used to significantly increase the value of mining businesses by

    Jan 1, 2013

  • SAIMM
    Case Studies Of Slope Stability Radar Used In Open Cut Mines

    By Keith Rowley, Neal Harries, David Noon

    The management of risks associated with slope instability is an essential process in the safe and economic operation of open cut mines. The ?slope stability radar? (SSR) has been developed to better m

    Jan 1, 2006

  • AIME
    Case Studies Of Stability On Mining Projects

    By C. O. Brawner

    Introduction The procedures used to design slopes in rock have only been developed over the past 10 years. Therefore, continued review and assessment of field experience by the publication of case st

    Jan 1, 1971

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • SME
    Case Studies On Modelling Heterogeneous Populations

    By F. H. Muge

    The problem of how to handle heterogeneous populations in an ore reserve global estimation arises in many geostatistical studies. In some cases it is possible to split data into different significant

    Jan 1, 1986

  • AUSIMM
    Case Studies on the Performance and Characterisation of the Froth Phase in Industrial Flotation Circuits

    By S R. Grano, M Vera

    This paper deals with two separate case studies investigating the froth phase performance and characterisation of two industrial rougher/ scavenger flotation circuits. Froth phase performance was quan

    Jan 1, 2005

  • SME
    Case Studies Using Diagnostic Testing And Plant Auditing To Reduce Operating Costs

    By D. Malhotra

    The economic viability of a mining operation depends on continuous process improvements. Diagnostic testing and plant auditing are essential useful tools to improve performance and reduce operating c

    Jan 1, 2001

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By R M. Smart, A T. Harrison

    Backfill systems using unconventional cementitious binders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two unc

    Jan 1, 1998

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • ISEE
    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018