Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies
By M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine
By J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014
-
Case Study – Blind Shaft Sinking for BHP Jansen Project
By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn
"The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with
Jan 1, 2019
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa
By G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave
By P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018
-
Case Study – PVC Ventilation Duct Road Map from Product Development to Ventilating Underground Mining Operation
By A. Rai
"This paper provides an overview of the current use of auxiliary ventilation product and the challenges with limited air quantity in dead-end entry or working face. The PVC low frictional factor, low
Jan 1, 2015
-
Case Study – PVC Ventilation Duct Ventilating Underground Mining Operation
By T. Weatherwax, A. Rai, J. Poor
"This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,
Jan 1, 2016
-
Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä Mine
By K. Huttu, A. van Wageningen
"The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern
Jan 1, 2015
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine
By J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Case Study: Natomas Levee Improvement Program Cutoff Walls
By Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Case Study: Sherritt’s Gordon’s New Fox Lake Copper-Zinc Concentrator
By Garry M. Hughes
Sherritt's new, 3000 tpd, copper- zinc Fox mine is situated 30 miles southwest of Lynn Lake. The copper-zinc orebody is part of a large body of massive and semi-massive sulfides consisting chiefl
Jan 4, 1972
-
Case Study: Advantages of High Rate Thickening at TISCO Jianshan Iron Mine
By T. Gong
Often plans to increase plant throughput provide an opportunity for optimising plant equipment and operating methods. This was the case in 2005 at TISCO Jianshan Iron Mine, when an increase in product
Jan 1, 2014
-
Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs
By Brian Lewis, Reinhold Daykin Schnell
Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos
Feb 6, 2023
-
Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013
By A. Jennings, J. Cornet, P. Perrone
Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi
Jan 1, 2013
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction
By A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment
By Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Case Study: Dragline Swing to Dump Automation
Case Study: Dragline Swing to Dump Automation By Peter Corke, CSIRO Manufacturing Technology/CRC for Mining Technology and Equipment (CMTE) Peter Corke presented a case study of a project to automate
Jan 1, 1997
-
Case Study: Feather River West Levee Program Cutoff Walls
By Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Case Study: High Capacity Spiral Concentrators
Spiral concentrators are compact, cost-effective and generally efficient gravity concentration separators for a wide range of applications (for example: coal, beach sands, iron ore, chromite and tanta
Jan 1, 2010
-
Case Study: Improved Bit Life Utilizing Advanced Cryogenics in Drilling and Blasting - SME Annual Meeting 2024
By Jenna Wundrack, Evan Thibaud
The advanced cryogenic treatment is a post-manufacturing metallurgical process that involves subjecting off-theshelf materials to extremely low temperatures, significantly improving wear resistance an
Feb 1, 2024