Search Documents

  • DFI
    Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban Slope

    By Mike Fabius

    The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o

    Jan 1, 2006

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017

  • ISEE
    Case Study: Mining Blast Information Management.

    By J Silva Castro, Braden Lusk

    Information management is important in all disciplines. In mining; collection and analysis of information before, during and even after mining is a keystone to performance. During mining, information

    Jan 1, 2012

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    "The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica

    Jan 1, 2017

  • TMS
    Case Study: Quality Improvement of Recycled Aggregates from a Construction and Demolition Waste Recycling Pilot Plant

    By Maria Margarida Lima, Maria Lucelinda Cunha, Dora Algarvio

    "The main goal of the present work is the quality improvement of the recycled aggregates produced by a construction and demolition waste (C&DW) recycling facility located in Montemor-o-Novo, Portugal.

    Jan 1, 2008

  • DFI
    Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In Virginia

    By Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed

    Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • ISEE
    Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines

    By Reinhold Schnell, Piers Wendlandt, Nathan Rouse

    Drilling and blasting are key components of every hard-rock (i.e.,metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the over

  • ISEE
    Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines

    By Reinhold Daykin, Piers Wendlandt, Nathan Rouse

    Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove

    Feb 1, 2020

  • ISEE
    Case Study: Technology Application for a Hardness Model in Minera Caserones

    By Hernan Navea, Carlos Alvarado, Exequiel Nuñez, Matías Suarez, Jhon Silva, Bryan Townsend, Bryan Caceres, Felipe Pontanilla

    Nowadays, technology dominates all aspects of human activities, and drilling and Blasting (D&B) is no exception. In most cases, the use of technology in D&B is focused on controlling individual activi

    Jan 21, 2025

  • SME
    Case Study: The Glenrock, Wyoming Subsidence Control Project

    By J. J. Gusek, J. T. Gormley, V. Scovazzo

    Glenrock, WY is underlain by two abondoned coal mines. Subsidence events have been recorded over the years, with the frequency increasing in recent years. As part of Wyoming's Abondoned Wins Land

    Jan 1, 1986

  • DFI
    Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations

    By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi

    Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player

  • CIM
    Case Study: Using Polymer Ducting for Face Ventilation of Coal Mines

    By Bryon Cerklefskie, Michael Schulte

    "This case study explores the usage of polymer ducting as a replacement to curtains and FRP for face ventilation in two coal mines. There are two mines looked at, one is the highest elevation undergro

    Jan 1, 2019

  • SAIMM
    Case Study: Using Software Optimization Techniques For The Optimal Allocation Of Equipment In A Mechanized Underground Mining Environment

    By D. Kok

    A challenge in mine planning is the optimal allocation of resources to the appropriate workplaces within the shift cycle (labour, equipment type, and other resources) in order to carry out the shift c

    Jan 1, 2012

  • IOM3
    Case-based reasoning: a catalyst for improvement

    By G. S. Pauley

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: Case-based reasoning can be a catalyst for improvement). A new c

    Apr 1, 1994

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017