Search Documents

  • SME
    New Insitu Instrumentation Technique For Tunneling & Mining Design: Field Examples

    By Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida

    A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to

    Jan 1, 1976

  • SME
    Hydraulic Shovel Digging Phase Simulation and Force Prediction Using Machine Learning Techniques - Mining, Metallurgy & Exploration (2021)

    By JESSICA W. A. AZURE, Samuel Frimpong, AZUPURI G. A. KABA, FORSYTH A. KADINGDI, PROSPER E. A. AYAWAH

    This study developed machine learning (ML) models for predicting rock formation reactive forces experienced by a hydraulic shovel bucket during excavation. To do this, rock formation in the form of mu

    Sep 27, 2021

  • SME
    Exploration Decision Analyses for the Brightwater Tunnels

    By L. Maday, V. J. Perrone, M. B. Gilbert

    INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen

    Jan 1, 2005

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • AUSIMM
    Machine Monitoring and Automation as Enablers of Lean Mining

    By L Mottola

    Three decades ago mining companies, principally in North America, aided by machine and explosive manufacturers, started significant attempts to develop and implement automated mining systems, mainly u

    Nov 22, 2011

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • NIOSH
    RI 4449 Preliminary Ceramic Tests Of Clays From Seven Pacific Northwest Deposits

    By Kenneth G. Skinner

    The rapid growth of the metallurgical, chemical, and allied industries on the Pacific coast just prior to and during the war caused a sudden increase in the demand for refractories, which was the imme

    Jan 1, 1949

  • AUSIMM
    Measurement of Blast Vibrations: Compliance under the RMA

    With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra

    Jan 1, 1996

  • NIOSH
    Microseismic Techniques For Monitoring The Behavior Of Rock Structures

    By Wilson Blake

    This report presents the results of a 7-year Bureau of Mines program to review, revise, and make an effective engineering tool of the microseismic method of determining the stability of rock structure

    Jan 1, 1974

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • TMS
    Iron Oxide Reduction With Conventional And Microwave Heating Under CO And H2 Atmospheres

    By Jiann-Yang Hwang

    Microwave heating has been proved an effective method to rapidly heat iron oxide. This offers an opportunity to apply microwave heating in the steelmaking process. The reduction reaction of iron oxide

    Jan 1, 2006

  • NIOSH
    Identification Of Distillable Paraffins, Olefins, Aromatic Hydrocarbons, And Neutral Heterocyclics From A Low-Temperature Bituminous Coal Tar

    By Clarence Karr

    AN EXTENSIVE characterization was conducted on the neutral oil components in a low-temperature bituminous coal tar. A total of tai individual compounds identified with respect to individual isomers, a

    Jan 1, 1967

  • AIME
    Geophysics and Geochemistry - Quantitative Distribution of Major and Trace Components in Rock Masses

    By E. H. T. Whitten

    Fundamental principles of trend surface analysis are briefly reviewed. Recent analyses of several granite masses illustrate the method of estimating the quantitative regional composition and also vari

    Jan 1, 1961

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • SME
    Eskay Creek Mine and Mill – A Continuing Success

    By Garry Biles

    The Eskay Creek Mine is a high-grade gold and silver underground mine in northwestern British Columbia. The mine started operations in late1994. For the first three years, ore was crushed to -50 mm(-

    Jan 1, 2000

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • SME
    Subsidence Impacts On Infrastructure And Drainage: Reestablishing A Stable Channel Using Geomorphic Design Principles

    By G. Krogman, C. Walla, B. Wood

    The Gebo Mining District (District) is located in the Bighorn Basin of Wyoming. Commercial underground coal mining began in 1906 with the arrival of the railroad in Thermopolis, which is located appro

    Jan 1, 2006

  • NIOSH
    OFR-130(3)-85 High Reliability Miner Hydraulic System - Volume II -Mining Hydraulics Manual ? 1. Introduction ? 1.1 General

    Hydraulic fluid power systems are advantageous whenever power output must be accurately and safely controlled. The load movers, cylinders, jacks, rotary actuators and hydraulic actuators in these syst

    Jan 1, 1982