Search Documents

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011

  • NIOSH
    OFR-88-83 Proceedings Of A Workshop Cyanide From Mineral Processing - February 2-3, 1982 Salt Lake City, Utah ? Preface

    The workshop on "Cyanide Effluents from Mineral Processing' was held on February 2-3, 1982, at the U.S. Bureau of Mines, Salt Lake City Research Center, Salt Lake City, Utah. The workshop was spo

    Jan 1, 1983

  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • ISEE
    Blasting in the New Mellinnium: Safety and CredibilityA Recipe for Success

    By Steve Dillingham

    In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov

    Jan 1, 2003

  • SME
    Assessment Of The Pathogenic Potential Of Asbestiform Vs. Nonasbestiform Particulates (Cleavage Fragments) In In Vitro (Cell Or Organ Culture) Models And Bioassays

    By Brooke T. Mossman

    Asbestos fibers are highly fibrous silicate fibers that are distinguished by having a large aspect (length to diameter) ratio and are crystallized in an asbestiform habit that causes them to separate

    Jan 1, 2007

  • NIOSH
    RI 5938 Studies Of The MnO-SiO2 Binary System - Summary

    By E. L. Singleton

    This Bureau of Mines investigation was initiated to study and establish some of the chemical and physical characteristics of the condensed Mno-Si02 system. To prevent oxidation of the manganous ion, I

    Jan 1, 1962

  • AUSIMM
    Proposesd Research Laboratory at Risdon, Tasmania, for the Electrolytic Zinc Co. of Australasia Ltd.

    The development of research activities at Risdon and the implementing of a policy of instrumentation in plant processes have, in recent years, entailed a considerable increase in research staff and cr

    Jan 1, 1949

  • AUSIMM
    A Quantitative Chemical Model of the Broken Hill Lead-Zinc Deposit

    A quantitative chemical model of the rocks of the Broken Hill lode environment is presented to illustrate a stratiform orebody in a meaningful form to scientists interested in environmental control on

    Jan 1, 1968

  • CIM
    A Simple Estimation Method of Materials Handling Specific Energy Consumption in HPGR Circuits

    By A. G. Doll

    "Multi-stage crushing plants, including high pressure grinding roll (HPGR) circuits, require more materials handling equipment than SAG and ball mill circuits. A temptation exists to neglect the energ

    Jan 1, 2015

  • SME
    Flotation Froth Image Segmentation Based on Highlight Correction and Parameter Adaptation Mining, Metallurgy and Exploration (ff8d32fd-da4e-43f4-8da2-8beb808a22d7)

    By Wen Tao Liu, Tong Tian, Fu Sheng Niu, Xiu Man Liang

    In order to address the difficulty of accurate segmentation of froth images of different sizes, a method of froth image segmentation based on highlight correction and parameter adaptation is proposed.

  • SAIMM
    Mine Closure From A Legal Perspective: Do The Provisions Of The New Mineral And Petroleum Resources Development Act And Draft Regulations Make Closure Legally Attainable?

    By C. Dixon

    The Abandoned Mine by C.C. Woollacott A heap of rocks marks the abandoned mine. The veld's unpitying silence lies around. Those broken stone?a mute and mournful sign Of human enterprise with fail

    Jan 1, 2003

  • SME-ICGCM
    Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface

    By F. N. Voskoboyev

    The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min

    Jan 1, 1996

  • DFI
  • SME
    Life Cycle Assessment of Environmental Protection Measures: The Mining Industry as an Example

    By G. Deissman, S. Kistinger

    For the last 15 years environmental Life-Cycle Assessments (LCA) have increasingly been used to evaluate the environmental performance of industrial processes and products and have been employed as a

    Jan 1, 2005

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft

    By Braam Blom

    PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f

    Jan 1, 2009

  • SME
    Convection mechanisms for geothermal heat exchangers in a vertical mine shaft - SME Transactions 2013

    By N. Wahl, D. M. Blackketter, R. Thornton

    This paper evaluated using a water-filled abandoned mine (Orphan Boy) as a heat source for a 240- kW closed-loop heat pump with the goal of heating a 2,000-m2 building. The mine has a 245-m vertical s

    Jan 1, 2013