Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
130 M Deep Bored Piles – A New Superlative
By Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Ettringite Precipitation for Sulfate and TDS Reduction: A 10 GPM Pilot Plant Study
By R. Bryce, T. J. Doughty, K. Stoll
Sulfate-impacted mine waters are under regulatory scrutiny to reduce total dissolved solids (TDS). There are several options to reduce TDS. One option is transforming the soluble sulfate into insolubl
Jan 1, 2019
-
Desenvolvimento De Manipulador Robótico Cartesiano De Baixo Custo Para Movimentação De Produtos Em Linhas De Produção Industriais
By Jeferson Preti
Este trabalho apresenta a análise, o projeto e o desenvolvimento de um manipulador robótico industrial de baixo custo para linhas de produção. O aparato proposto possui potencial para contribuir na me
Jul 30, 2018
-
The Berkeley Art Museum: Repurposing a Historical Building
By Timothy Nelson, Simon Burnworth
"The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne
Jan 1, 2016
-
Current Billing Technology In Mineral Exploration
By Emerson J
Drilling has always been one of the most important parts of the exploration process with most companies spending around 25% of their budget on drilling. Although superficially there appears to be
Jan 1, 1987
-
Use of a New Insertion Apparatus for Improving Performances of the Friction Rock Stabilizers
By İbrahim Gunes, ATILA GURHAN CELIK, Eren Komurlu
This study introduces a new apparatus designed to improve the load-bearing capacities and insertion efficiency of split set type friction bolts. Laboratory and site studies demonstrated the apparatus’
Jan 3, 2022
-
RI 9532 - In Situ Stress At The Lucky Friday Mine (In Four Parts): 1. Reanalysis of Overcore Measurements From 4250 level
By J. K. Whyatt
During the past 2 years, U.S. Bureau of Mines (USBM) researchers reviewed an in situ stress investigation conducted in 1977 at a test site on the 4250 level of the Lucky Friday Mine, Mullan, ID. Altho
Jan 1, 2010
-
RI 6759 Use Of A Continuous Borer In Mining Pitching Anthracite Beds
By W. H. Tavenner
The Bureau of Mines gathered test data on the use of a continuous borer in mining an anthracite bed, which was 30 feet thick on a pitch of 15° to 45°. Gangways were driven with the continuous borer,
Jan 1, 1966
-
IC 6691 Square-Set System Of Mining ? Introduction
By E. D. Gardner
This paper on the square-set system of mining embodies the results of a special study of the subject made as a part of the Bureau of Mines general investigation of mining methods and costs. Data for t
Jan 1, 1933
-
Manufacture Of Sterling Silver And Some Of Its Physical Properties
By Robert H. Leach, C. H. Chatfield
THIS paper gives a brief summary of the process of manufacture of sterling silver, and some of its more important physical properties, as observed in commercial production of rolled sheet and wire. Al
Jan 1, 1928
-
RI 5769 Physical And Mechanical Properties Of Electrorefined Vanadium ? Introduction And Summary
By J. D. Ramsdell
The object of this investigation by the Federal Bureau of Mines was to evaluate the workability, recrystallization characteristics, and mechanical and physical properties of high-purity electrorefined
Jan 1, 1961
-
RI 4374 Application Of Ion Exchange Resins In The Cyanidation Of A Gold And Silver Ore
By S. J. Hussey
Since the discovery in 1935 by Adams and Holmes that certain synthetic resins exhibit ion-exchange properties, many applications of the ion-exchange process have been made. There are two general types
Jan 1, 1948
-
RI 8504 Corrosion of Materials and Scaling in Low-Salinity East Mesa Geothermal Brines
By F. X. McCawley
The Bureau of Mines, in pursuing its goal of extending the life span of strategic materials, conducted field corrosion studies at the East Mesa Known Geothermal Resources Area (KGRA) in the Imperial V
Jan 1, 1980
-
Electrocatalytic Reduction of CO2 to C2H4 at a Gas/Solution/Metal Interface
By Kotaro Ogura
"The electrolysis process in which CO2 is selectively reduced to C2H4 at a three-phase(gas/solution/metal) interface on a copper-mesh electrode has been developed in a concentrated solution of potassi
Jan 1, 2008
-
Loading Characteristics Of Gold-Bromo Species Onto Activated Carbon
By R. K. Mensah-Biney, M. T. Hepworth, K. J. Reid
The loading characteristics of gold-bromide species onto activated carbon were evaluated using a batch system. The overall loading of gold onto activated carbon was rapid for the first few hours, but
Jan 1, 1994
-
Modelling slope behaviour for open pits
By Q. H. Liao, B. G. Monaghan
The options for designing slopes in complex geological conditions are reviewed. It is shown that modelling, especially numerical modelling, allows a degree of analysis that cannot otherwise be achieve
Jun 18, 1905
-
Ore Haulage System At Ozark Lead Company
By Roy H. Paddon
This paper describes the 6, 000 tpd, three stage haulage system at the Ozark Lead Company's mine in southeastern Missouri. It details the methods and problems pertinent to the loading, hauling, s
Jan 1, 1971
-
The Integration of Geometallurgy with Plant Design
By G Harbort
Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat
Aug 8, 2011
-
OFR-92-75 Statistical Evaluation And Mititigation Of Inductive Interference Problems In Portable Power Cables - Review Of Intermachine Arcing Research - 1.1 Introduction
By Eldon K. Stanek
The material presented in this chapter is a review of the work done during the period from June 23, 1972 to June 22, 1973 which was reported in detail in the first annual report for Grant No. 60122088
Jan 1, 1975
-
Financial Modelling with the Auditor in Mind
By S G. Gemell
"The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing
Mar 8, 2016