Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis
By Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
Two Case Studies Of The Performance Of Rib Supports
By M. K. Larson
The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing
Jan 1, 1996
-
The Planning of Modern Colliery Development for the Steel Industry
By Lonie W. M
The rapid development of the Australian steel industry over the past twenty years has greatly increased the demand for coking coal from the collieries owned by the Broken Hill Proprietary Co. Ltd. and
Jan 1, 1957
-
Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating
By Michael Wieland
For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t
Jan 1, 2006
-
Implementing Best Practices of Metal Accounting at the Strathcona Mill
By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney
"The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern
Jan 1, 2012
-
Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada
By Stephen P. Quin
One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti
May 1, 2003
-
Design Risk Mitigations for Contract CQ028 of the East Side Access Project
By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,
By Met B. E
During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in
Jan 1, 1937
-
Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: V. The Formation of Chiolite by Reaction Between Molten Cryolite and Aluminium
The reactions between molten aluminium and cryoIite have been determined from a material balance of all components involved in the process. The interpretation of results were supported by x-ray diffra
Jan 1, 1968
-
DC Arc Smelting Of Silicon: Is It Technically Feasible?
By M. Abdellatif
Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p
Jan 1, 2011
-
Design and Performance of a Longwall Coal Mine Water-Barrier Pillar
By Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007
-
Mineralogy and Textures of Thackaringa Sulphide Ore (24fa3d6b-5e1a-4d95-911e-22279cdb9bf0)
In his account of the Thackaringa sulphide ore, Lawrence (p. 92) reports the presence of valleriite as a minor accessory in chalcopyrite. He says that it is readily identified by its intensive anisotr
Jan 1, 1967
-
Coarse Lead Flotation Practice at Polaris
By R. Simkus, J. K. Gowans
Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation
Jan 1, 1984
-
Pitfalls And Lessons Learned In Pump Station Construction
By Steven R. Lowe
Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr
Jan 1, 2011
-
Institute of Metals Division - Effect of the Shapes of Intergranular Liquid on the Hot Cracking of Welds and Castings
By J. C. Borland, J. H. Rogerson
Jan 1, 1963
-
Canadian Paper - Loading Ore Underground with Scrapers at the Utah-Apex Mine
By S. P. Holt
The chief use of scrapers at this mine has been on lead ore of milling grade, clean and dry, in stulled stopes, 50-100 ft. long, 5-12 ft. high, and pitching 20-30°. Scrapers have also been used to fil
Jan 1, 1923
-
Canadian Paper - Loading Ore Underground with Scrapers at the Utah-Apex Mine
By S. P. Holt
The chief use of scrapers at this mine has been on lead ore of milling grade, clean and dry, in stulled stopes, 50-100 ft. long, 5-12 ft. high, and pitching 20-30°. Scrapers have also been used to fil
Jan 1, 1923
-
RI 5946 The Performance And Operating Characteristics Of An Image Furnace Having 60-Inch Paraboloidal Mirrors ? Summary
By Edwin E. Maust
In response to the ever- increasing demand for high temperature materials, the Bureau of Mines instituted a program for the study and development of superrefractories, One of the major tools obtained
Jan 1, 1962
-
Examination Of Solid Phase Materials From Column Leaching Studies Of Coal Refuse/Coal Fly Ash Bulk Blends – Preprint 97-78
By B. R. Stewart, L. W. Zelazny
The exclusion of coal fly ash from regulation as a hazardous waste has led to increased interest in returning ash to the coalfields for co-disposal. A multi-year column study used coal refuse with hig
Feb 24, 1997
-
RI 3183 Smelting in the Lead Blast Furnace
By G. L. Oldright, Virgil Miller
"This paper is the tenth 4 of a series on smelting in the lead blast furnace, and the fifth 5 on modifications brought about by the introduction of richer charges.ACKNOWLEDGMENTSAll of the data on han
Aug 1, 1932