Search Documents

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • ISEE
    Gravois Bluffs: Review of a Successful Large-Scale Blast-Monitoring program.

    By David Weidner

    Public relations, regulatory compliance, determination and implementation of pre-blast inspections, and accurate blast monitoring data are all essential components when conducting blasting operations

    Jan 1, 2001

  • SME
    Northeast Interceptor Sewer Case History

    By Brett Zernich, Michael Krulc, Brett Robinson

    This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade

    Jan 1, 2005

  • ISEE
    Protection Against Litigation with Good Pre-Blast Surveys, Damage Inspections and Record Keeping

    By Randall Wheeler, R. Frank Chiappetta

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation. and Explosives Applications - Orlando, Florida, USA July 24 - 27,200O 2000 BAI - PROTECTION AGAINST LITIGATION WITH GOOD PRE-BLAST SURVEYS,

    Jan 1, 2000

  • DFI
    Crane Boom Loadings From Pile Driving

    By Alan G. MacKinnon

    Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s

    Jan 1, 1986

  • DFI
    Installation Parameters, Pile Performance and Importance of Testing

    By Maurice Bottiau

    "Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co

    Jan 1, 2014

  • AUSIMM
    Microbes and their Metabolites - Potential Iron Ore Flotation Reagents

    By R Dwyer, S Rea, W J. Bruckard, N McSweeney, R Holmes

    "The innate ability of microorganisms to adapt to changing or inhospitable environments has often been exploited for industrial purposes and forms the basis of many current biotechnological processes.

    Aug 12, 2013

  • AUSIMM
    Crushing and Screening Operations at Mount Tom Price

    Mine ore, reduced to minus 71/2 in. by primary crushers, is stockpiled. Size reduction of the reclaimed material by secondary and tertiary crushers is achieved in a closed circuit crushing and screeni

    Jan 1, 1970

  • AUSIMM
    Copper Reduction from Solution With Copper Sponge

    The observation of lower-than-predicted Fe/Cu ratios in the cementation of copper on iron in tests at elevated temperatures indicated that some other reaction was contributing to the reduction of cupr

    Jan 1, 1974

  • DFI
    Sonic Integrity Testing - 1.0 Summary

    By A. F. van Weele

    In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to

    Jan 1, 1987

  • SME-ICGCM
    Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam Mining

    By Axel Studeny

    Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is

    Jan 1, 2007

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • DFI
    Selection & Design Of Augered Cast-In-Place (ACIP) Piles

    By Dan A. Brown

    Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa

    Jan 1, 2004

  • NIOSH
    RI 7576 Structural Deformation Of Green River Oil Shale As It Relates To In Situ Retorting

    By P. R. Tisot

    Structural response and/or deformation was determined for each of four different grade Green River oil shales (27.0-, 34.5-, 45.5-, and 63.5-gal/ton) as they were heated in an inert atmosphere, under

    Jan 1, 1971

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • IIMP
    Evaluación geotécnica en la apertura de nuevos accesos para la optimización en el ciclo de carguío de mineral

    By Alcides Eloy Cano

    Los recursos minerales de un depósito está en función de las dimensiones de la geometría del cuerpo mineral, así como sus reservas minables permiten saber el verdadero valor económico de su contenido.

    Sep 12, 2011

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • IIMP
    Circuitos abiertos alternativa de mejora en la performance metalúrgica en concentradoras

    By Hermes Vilchéz

    El presente texto describe los beneficios de la apertura de los circuitos de flotación como alternativa de mejora en la performance metalúrgica de las concentradoras. El trabajo se efectuó en la empre

    Sep 9, 2007

  • SAIMM
    Advanced Methods To Characterize Thermal Properties Of Quartz

    By E. H. Myrhaug, K. Aasly, T. Malvik

    Six different types of quartz and quartzites used as raw materials by ferroalloy plants have been investigated with respect to their thermo mechanical properties. In order to investigate the effect of

    Jan 1, 2007