Search Documents

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal Operations

    By Dominic Fragomeni, Tony DiFeo, Martyn P. Hay

    "As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E

    Jan 1, 2006

  • SME
    The Effectiveness Of Task-Based Noise-Exposure Assessment Methods For Monitoring Miner Noise Hazards

    By C. Bise, A. Seal

    Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during both the mid-1970s and the mid-1990s consistently show that hearing hearing loss within the mining industr

    Jan 1, 2001

  • SAIMM
    Monte Carlo Simulation Of Pt-Al Thin Film Diffusion - Synopsis

    By R. A. Harris

    In this study Pt-Al thin films were prepared via electron beam physical vapour deposition (EB-PVD) with an atomic concentration ratio of Pt25:Al75. These films were heat treated at temperatures rangin

    Jan 1, 2011

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • NIOSH
    MLA 22-87 - Mineral Resources Of The Skedaddle Study Area, Lassen County, California And Washoe County, Nevada ? Summary

    By Steven R. Munts

    In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 39,420 acres of the 60,960-acre Skedaddle Wilderness Study Area in order to evaluate its identified mine

    Jan 1, 1987

  • SAIMM
    Fatigue Knowledge?A New Lever In Safety Management - Synopsis

    By W. J. Theron

    The purpose of the paper is to give an introduction to the concept of fatigue and its causes in the mining industry. By knowing the fundamental role it plays, together with its dynamics, can positivel

    Jan 1, 2011

  • AUSIMM
    Gold Dredging Practice in New Zealand û Past and Present

    This paper is in two parts. The first covers the evolution of dredging leading to the development of the æNZ typeÆ large dredge and the second, current alluvial gold recovery practice in NZ. NZ was t

    Jan 1, 1985

  • ISEE
    Measuring Blast Movement to Reduce Ore Loss and Dilution

    By Darren Thorton, David Sprott, Ian Brunton

    Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe

    Jan 1, 2005

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • NIOSH
    OFR-90-79 Improved Light Scattering Dust Monitor

    By Pedro Lilienfeld

    This report describes the development, design, fabrication and testing of a port-able, battery-operated, light scattering monitor (henceforth to be designated as ILSDM) for the rapid measurement of th

    Jan 1, 1979

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • SME
    Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard

    If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was

    Jan 1, 2012

  • TMS
    Modelling And Control Of Copper Isasmelt Furnace

    By Pengfu Tan

    One copper Isasmelt furnace has been operated in Xstrata Copper at Mount Isa in Australia since 1992. A thermodynamic model and computer program, CuModel, has been developed to model the distribution

    Jan 1, 2006

  • AIME
    Institute of Metals Division - Thermodynamic Activities in the Fe-Mn-C System

    By J. F. Butler, H. W. Paxton

    The vapor pressures of manganese in equilibrium with several alloys in the iron-manganese-carbon system between 1200° and 1275°K have been measured using the Knudsen effusion technique in conjunction

    Jan 1, 1962

  • SME
    Inability to communicate : How technical professionals cut short their management careers

    By H. Richard Eisenbeis, Donna M. Watkins

    Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort

    Jan 8, 1987

  • NIOSH
    IC 7234 Marketing Kyanite And Allied Minerals ? Introduction

    By Nan C. Jensen

    Modern high-temperature metallurgical processes have created a demand for raw material for furnace parts and lining that not only will with-stand high temperatures is but will not react with the subst

    Jan 1, 1943

  • SAIMM
    Time-Dependent Tensile Strengths of Bushveld Complex Rocks and Implications for Rock Failure Around Mining Excavations

    By D. Nyungu

    Despite observations of spalling and damage of mine excavation wall rock in the Bushveld Complex (BC) over the passage of time, there have been very few time-dependent or creep tests carried out in So

    Jan 1, 2014

  • NIOSH
    OFR-10-84 Concurrent Establishment Of Ground Cover And Hardwood Trees On Reclaimed Mineland And Unmined Reference Sites ? Summary And Conclusions ? Introduction - Background

    By W. R. Byrnes

    This project was initiated on October 1, 1980 and will be completed on December 31, 1983. The project was Initially approved and funded by the Office of Surface Mining and subsequently was moved to th

    Jan 1, 1983