Search Documents

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SAIMM
    Technical skills?a major strategic issue - Synopsis

    A shortage of technical skills in all areas of the mining industry is being experienced worldwide. This has significant consequences for design, operations, productivity and safety and, therefore, nee

    Jan 1, 2009

  • SAIMM
    Air Pollution Control System Upgrade At Tubatse Ferrochrome

    By Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday

    Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system

    Jan 1, 2007

  • SME
    The Upper Pennsylvanian Pittsburgh Coal Bed: Geology And Mine Models

    By L. F. Ruppert, W. D. Watson, S. J. Tewalt, L. J. Bragg

    The U.S. Geological Survey recently completed a digital coal resource assessment model of the Upper Pennsylvanian Pittsburgh coal bed which indicates that of the original 34 billion short tons [31 bil

    Jan 1, 2000

  • AUSIMM
    The Little Beach - Wallace Beach Mineral Sand Deposit, Catlins Area, New Zealand

    This paper reviews the gold mining history and recent exploration activities on a number of beaches in the Catlins area of coastal South Ota

    Jan 1, 1992

  • NIOSH
    OFR-160-77 The Hydraulic Transportation Of Oil Shale

    By James M. Link

    A program was initiated tinder sponsorship of the U. S. Bureau of Mines to investigate pipeline behavior of raw and spent oil shale slurries. Slurries were recirculated in pipeline loops with 150-mm a

    Jan 1, 1977

  • SAIMM
    Mining Simulation For Room And Pillar Coal Operation - Synopsis

    By S. P. Pereira

    The mechanized mining cycle using loaders and shuttle cars had it speak in terms of usage in the mining industry during 1950 through 1960. In Brazil, this system is still used at underground coal mine

    Jan 1, 2012

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning ? Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • NIOSH
    OFR-33-81 Detection Instrumentation For Cable Shield Defects

    By James R. Cosby

    This report describes work performed for the Bureau of Mines to evaluate available portable instruments for their effectiveness in detecting and locating damaged metallic shields in Types SHD and SHC

    Jan 1, 1980

  • DFI
    Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted Micropiles

    By Tom Szynakiewicz

    Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea

    Jan 1, 2008

  • SME
    Upgrading Gasifier Slag – Preprint 97-69

    By M. S. Klima, V. Choudhry

    Coal gasification solid residue (slag) contains unconverted carbon (char) which is considered an impurity for utilization applications of slag. Under this study, table concentration was used to proces

    Feb 24, 1997

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • SAIMM
    Pushback 8 South ? A Case Study In Pit Slope Management

    By P Knight, P A. Walker, H E. Speight

    Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i

    Jan 1, 2006

  • ISEE
    Blast-Induced Heave Modeling in Three Dimensions

    By Dale Preece, Ayman Tawadrous

    This paper presents a number of examples of three-dimensional blast modeling in both surface and underground environments that include time-delay explosive decking. These examples include: 1) quarry b

    Jan 1, 2014

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    May 1, 2009

  • NIOSH
    Noise & Hearing Protection - Development Of Two Training Exercises For Drillers

    By Edward A. Barrett, Roberta A. Calhoun

    MORE THAN 30 MILLION EMPLOYEES each year are exposed to hazardous occupational noise, and approximately one-third of them develop permanent hearing loss (NSC, 2000). Possible explanations for the latt

  • SAIMM
    Strength and mechanics of fractured rocks under triaxial loadings

    By A. M. Hefny, F. P. Siew, P. G. Ranjith

    Fracture initiation and propagation, being one of the most intensive subjects in rock mechanics; contribute significantly to the deformation of jointed rock masses. An experimental study on fractured

    Jan 1, 2003

  • TMS
    Effect of Refractive Index on the Determination of Layer Thickness of 4H-SiC Homo-Epitaxial Films

    By Zhiyun Li

    Room temperature infrared reflection spectra of 2 n-type homo-epitaxial epifilms have been measured in the work. The effect of the refractive index on the determination of layer thickness using tradit

    Jan 1, 2010

  • CIM
    Stress Distribution in Inclined Backfilled Stopes

    By L. Li

    The backfilling of underground stopes is a common practice throughout the mining industry. The stresses imposed by the backfill on the surrounding rock mass need to be assessed because of their influe

    May 1, 2007

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009