Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Greenhills surface coal mining project
By Clifford Britch
"Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine
Jan 1, 1981
-
Particle Breakage Studies In An Impact Crushing Environment
By M. D. Flavel
Research programs conducted by Allis-Chalmers Corporation are showing that the most efficient energy use in crushers is achieved when the forces applied to particles undergoing breakage are increased.
Jan 1, 1981
-
Mineral Highlights - General (e83082ae-4423-42b4-9d0c-2714fd984824)
The Anaconda Copper Company reportedly reached an exclusive agreement with Cook Inlet Region, Inc., to explore 24 million acres in south-central Alaska and to share equally with Cook the proceeds of a
Jan 1, 1981
-
OFR-161(1)-81 Control Of Water Pollution From Surface Mining Operations
By David R. Jessey
Water pollution problems associated with surface metal/nonmetal mines throughout the United States were assessed. Three major problems were identified: acid mine drainage (AMD), toxic concentrations o
Jan 1, 1981
-
OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - Appendices
By Daniel I. Carey
Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It
Jan 1, 1981
-
OFR-92-82 Feasibility Of Using Cemented Backfill In Active Underground Coal Mines To Prevent Subsidence
By D. V. Gaffney
This report presents the results of a three-phase investigation of the feasibility of using cemented coal waste in active underground coal mines to prevent mine subsidence. Coal caste was broadly defi
Jan 1, 1981
-
OFR-90-82 Analysis Of Groundwater Criteria And Recent Restoration Attempts After In Situ Uranium Leaching
By Grant Buma
Groundwater restoration is an uranium leaching. Information on the technology, costs, and the current permitting regulations is of vital operators and to firms considering in important aspect of in si
Jan 1, 1981
-
OFR-161(2)-81 Appendix Volume - Control Of Water Pollution From Surface Mining Operations
By David R. Jessey
This volume contains the detailed mine site reports written by the WAPORA, Inc. and KETRON, Inc. staffs. It is a companion Appendix Volume to Control of Water Pollution from Surface Mining Operations.
Jan 1, 1981
-
OFR-57-82 Undercut And Fill System For Pitching Coal
By Arnis Mangolds
A study of the technical and economic feasibility of using a unique undercut and fill system developed by USBM engineers to mine steeply pitching coal is discussed. A brief resource assessment has ind
Jan 1, 1981
-
OFR-4-83 The Quenching Behavior Of Coal Dust-Air Mixtures
By Frank T. Greene
An investigation of the quenching behavior of coal dust-air flames was carried out. The literature relevant to coal dust-air flames was reviewed, including information on the agglomeration, sedimentat
Jan 1, 1981
-
OFR-155-82 Longwall Mining Principles For Safely Working Steep Coal Seams
By Roger F. J. Adam
This report summarizes the principles of safely working steep coal seam using longwall mining methods. It presents the state-of-the-art and identifies the problems which result from seam inclination.
Jan 1, 1981
-
OFR-103(1)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume I: Technical Report
By Michael L. Clar
The U.S. Bureau of Mines contracted a study to determine the feasibility of water diversion and overburden dewatering for underground coal mines in the Appalachian Region. All relevant published liter
Jan 1, 1981
-
OFR-37-82 Potential Effect Of Ferrous Scrap Composition Changes On The Quality Of Iron And Steel Castings
By W. L. Swager
Tramp (undesirable) elements introduced into iron and steel castings via purchased ferrous scrap are evaluated as to their likely degree of future threat to the quality of castings. Conclusions are ba
Jan 1, 1981
-
IC 8857 Mine Waste Disposal Technology - Proceedings: Bureau Of Mines Technology Transfer Workshop, Denver, Colo., July 16, 1981
This Bureau of Mines publication consists of an overview of the mine waste management research currently being conducted by the Bureau. The following papers, given at a Technology Transfer Workshop, e
Jan 1, 1981
-
The Evolving Role Of Water-Only Cyclones In Fine Coal Cleaning
By Robert Hochscheid
When the original water-only cyclone patents were established in the 1950?s, the supplies of low cost oil and natural gas were abundant and low selling prices for metallurgical and steam coal provided
Jan 1, 1981
-
OFR-109-85 Advancement Of Cab And Canopy Design And Use In Coal Mines
By W. W. Aljoe
The use of protective canopies can result in canopy roofing and/or serious restrictions to operator comfort and vision. To document this experience, BCR conducted a field study of cab and canopy desig
Jan 1, 1981
-
OFR-182-82 Burial Of Potentially Toxic Surface Mine Spoil
By L. B. Phelps
A method is presented for the burial of potentially toxic spoil in high density zones or packages within spoil piles. Such burial could reduce the outflow of pollutants and thus minimize contamination
Jan 1, 1981
-
OFR-151-81 Evaluation And Demonstration Of A New Post Disaster EM Communication Technique For Mines
By M. P. Ristenbatt
A new automated post-disaster signaling system, intended to use through-the-earth EM propagation, was demonstrated in the laboratory at an input SNR of -34 dB. The system presently available requires
Jan 1, 1981
-
OFR-33-82 Environmental Instrumentation In Mining Air And Water
By Richard C. Moore
The U.S. Bureau of Mines contracted a study to review the air and water monitoring requirements of five Federal environmental acts (the Federal Water Pollution Control Act, the Safe Drinking Water Act
Jan 1, 1981
-
OFR-61-82 Design And Develop Feasible Lighting System For Conventional Slopes Under Construction
By William F. Hahn
This report describes an illumination system suitable for use in a slope under construction, Simulator work was performed using actual lighting hardware to verify adequate light levels to meet MSHA pr
Jan 1, 1981