Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
IC 8720 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines Developed For Longwall Mining - Mines With Annual Production Of 1.3 And 2.6 Million Tons By Longwall Mining From A 48-Inch Coalbed
By John R. Duda
The Bureau of Mines is developing estimates of capital investment, operating cost, and selling price for underground mines producing bituminous coal by various mining methods. This study estimates the
Jan 1, 1976
-
OFR-67-78 MCM-101 To UHF Coupler Interface Unit
By Larry R. Wilson
The development effort described herein was directed toward the design and development of a flexible communication system to provide two-way section communications between any telephone on an MCM-101
Jan 1, 1976
-
Mineral Indicators - Antimony -
A new mine has begun production of antimony ore and concentrates in Serbia, Yugoslavia. The mine is operated by the mining and metallurgical enterprise "Aajaca." Initial production is running at appro
Jan 1, 1976
-
OFR-138-77 Development Of High-Pressure Water Jet Equipment For Underground Application Of Excavating Energy Minerals
By Russell J. Miller
A high-pressure intensifier system was designed, constructed and field tested as part of a program to determining the feasibility of applying high-pressure water jets on conventional mechanical rock e
Jan 1, 1976
-
The Sampling System of Courier 300 Analyzer
By Tapio Leskinen
"l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w
Jan 1, 1976
-
OFR-121-78 Design Of A Retrofittable Temporary Face Support System
By Alfred Bellows
The objective was to develop and design a remotely operated temporary roof support system that provides a safe working environment between a freshly cut coal face and the last line of permanently supp
Jan 1, 1976
-
Sampling of Gold Bullion: Problems and Answers
Sampling is an integral part of gold bullion analysis. Gold mining industries sell millions of dollars worth of gold on the basis of analyses. Biased sampling can cause a serious loss in terms of mone
Jan 1, 1976
-
Preparing for Automated Sample Preparation
Preparing for automated sample preparation has two facets; the need for better procedures as seen by the laboratory Manager and the approach to be adopted as envisaged by the equipment manufacturer. B
Jan 1, 1976
-
RI 8115 Analyses of Tipple and Delivered Samples of Coal - Collected During Fiscal Year 1975
By J. B. Janus
This report, the 25th in a series, lists analytical data of coal samples collected by the Bureau of Mines in connection with the purchase of several million tons of coal for various Government agencie
Jan 1, 1976
-
IC 8707 The State Of The U.S. Coal Industry - A Financial Analysis Of Selected Coal-Producing Companies With Observations On Industry Structure
By T. T. Tomimatsu
This? Bureau of Mines paper discusses the corporate structure dynamics, methods of financing, and financial assessment approaches that should be utilized to evaluate the economic health of the coal in
Jan 1, 1976
-
Mineral Indicators - Asbestos:
The Particulate Mineralogy Unit has been established at the College Park, Maryland, Metallurgy Research Center. The Particulate Mineralogy Unit will have the responsibility within the Bureau of Mines
Jan 1, 1976
-
OFR-33-77 Improved Mineral Excavation Nozzle Design Study - Summary
By P. D. Lohn
The objective of this program was to develop nozzle designs to maximize the effective cutting length of a water jet. The results of the theoretical program directly support the Bureau of Mines Borehol
Jan 1, 1976
-
Highlights - Aluminum -
Reynolds Metals Company announced plans to increase its rate of production of primary aluminum by 17 thousand tons per year by the end of February. Other producers were expected to increase operating
Jan 1, 1976
-
What Started It
At first glance the staid Joralemon background does not seem to equate with the life of adventure that irresistibly called me for over 70 years. But my ancestors had their adventures too. My father&ap
Jan 1, 1976
-
IC 8703 Basic Estimated Capital Investment And Operating Costs For Coal Strip Mines - Revision Of Information Circular 8661
By Sidney Katell
This Bureau of Mines study estimates typical capital investments, operating costs, and selling prices for two bituminous coal strip mines in the Eastern and Interior provinces and a subbituminous coal
Jan 1, 1976
-
IC 8711 Recycling Trends In The United States: A Review
By Max J. Spendlove
This Bureau of Mines publication reviews current recycling trends in the United States. Although near-term prospects are poor for recycling most present wastes, urban refuse is an important exception.
Jan 1, 1976
-
Economics Of Coal Preparation ? Introduction
By R. M. Quinlan
The coal industry in the United States has undergone significant economic changes during the past six years. The price of coal remained relatively constant from 1950 to 1969 (See Figures 1 and 2). Ste
Jan 1, 1976
-
OFR-76-78 Materials Suitable For Use In Explosion-Proof Enclosures
By Lloyd A. Morley
The problems associated with the presence of organic materials and of water in explosion-proof enclosures used in high voltage, high capacity applications were examined through a literature search and
Jan 1, 1976
-
Highlights - Bituminous Coal And Lignite -
The number of railroad coal cars (open top hoppers), dominated rail car orders and deliveries in 1975 according to announcements made February 11, by the Association of American Railroads and the Amer
Jan 1, 1976
-
Mineral Indicators - Aluminum: (8360beb9-cad2-41f6-97b0-42204723aeec)
At the end of August, U.S. producer posting of 99.5 percent unalloyed aluminum had been established at 48¢ per pound. At that time, dealer-quoted unalloyed ingot was reportedly at 44¢-47¢. CADMIUM
Jan 1, 1976