Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Interim Conclusions & Recommendations Derived From Study Of Large-Scale Surface Mining Systems ? 1. Introduction
By Jerrold J. Marcus
United states reserves of oil and gas have been steadily declining while consumption of petroleum products has continued to increase. The nut result has been an ever increasing shortfall between suppl
Jan 1, 1975
-
OFR-72-76 Water Jet Chock Mounted Miner Feasibility Study ? Executive Summary
The contract for the Water Jet Chock Mounted Miner Feasibility Study was awarded to FMC Corporation's Advanced Products Division on 18 November, 1974. The program was divided into four phases as
Jan 1, 1975
-
The Evaluation of the Mining Aspects of Coal Projects
The basic model for the evaluation of any coal-bearing property is the cash flow projection, the major components of which are operating costs, capital charges, taxation and revenue. A range of cash
Jan 1, 1975
-
Planning For Coal Gasification - Supplement to Tables VII and VIII providing additional data
By Ralbern H. Murray
Typical First Year Selling Price Strip Mined Western Sub-Bituminous Coal Based [Fixed Capital (1) $600 MM Construction Loan Interest $100 Working Capital $ 30 Start-up Costs $ 30 Total Capit
Jan 1, 1975
-
Computer Model Development
By R. V. Ramani, V. T. Burgos, J. A. McClay
Cost System The cost system reported here is a suite of computer programs which incorporates the logic and information flow structure as outlined in earlier chapters. Specifically, computer progra
Jan 1, 1975
-
Markets And Specifications For Magnetic Metals Recovered From Municipal Solid Waste
By Drew A. Meyer
Magnetic metals are the granddaddy of products which may be recovered from municipal waste. Aside from hand-picking of newsprint and corrugated boxes, magnetic metals are usually the first items a res
Jan 1, 1975
-
Economics Of Cement Transportation ? Introduction
By S. K. M. Chao
The increasing demand for large volumes of relatively low-cost cement has resulted in the need for an equally low-cost high-volume means for transporting that cement. It has been estimated that 20
Jan 1, 1975
-
OFR-85-75 Develop And Test Canopy Air Curtain Devices - 1 Introduction And Summary
By William J. Krisko
This contract final report summarizes the design, fabrication and testing of canopy air curtain devices under Bureau of Mines Contract H0232067. The canopy air curtain device is designed to reduce the
Jan 1, 1975
-
IC 8684 Analyses Of Natural Gases, 1974 ? Introduction
By B. J. Moore
This publication contains analyses and related source data for 352 natural gas samples from wells and pipelines in 18 States and 5 foreign countries. All of the samples were obtained and analyzed duri
Jan 1, 1975
-
OFR-86-76 Study Of Continuous Face Haulage Systems - Introduction
This study relates to continuous face haulage systems in underground coal mines, and was performed by Joy Manufacturing Company for the U. S. Bureau of Mines under the Bureau of Mines Contract No. HO
Jan 1, 1975
-
OFR-28(1)-76 Survey Of Underground Hydraulic Coal Mining Technology - Volume 1 - Phase II Report ? Summary
By William C. Cooley
This report includes a review of all relevant data on underground hydraulic coal mining technology collected during Phases I and II of the contract. Data collection and analysis procedures are discuss
Jan 1, 1975
-
OFR-11-76 Development Of An Illumination System For Longwall Coal Mines - 1.0 Introduction
By Gary Friedline
As a consequence of the Coal Mine Health and Safety Act of 1969(PL91-173), the Bureau of Mines (BOM) entered into a contract with Ocean Energy Inc. (OEI) to develop, fabricate, install, and evaluate a
Jan 1, 1975
-
IC 8695 Coal Surface Mining Reclamation Costs - Appalachian And Midwestern Coal Supply Districts
By Robert J. Evans
Reclamation costs were estimated for 20 coal surface mining operations in the Appalachian and Midwestern Coal Supply Districts (these two districts were divided into three multi-State regions). The co
Jan 1, 1975
-
OFR-18-76 Economic Feasibility Of Recovering And Utilizing Methane Emitted From Coal ? I. Summary - A. Purpose And Scope
The U.S. Bureau of Mines has been concerned for many years with the general problems of underground coal mining and the particular problems due to the methane content of the coal. The Bureau and other
Jan 1, 1975
-
-
OFR-60-75 Advanced Techniques For Radon Gas Removal - I Summary And Conclusions
The following report summarizes the results of engineering feasibility studies whose purpose was to assess the probable efficiency, reliability, safety and cost of a number of possible methods for rem
Jan 1, 1975
-
OFR-23(2)-79 Study Of Methods To Improve Pillar Extraction Practices In Underground Coal Mines - Volume II - Haulage Practices In Retreat Mining ? I. Introduction
The following pages discuss the objectives, the background, and scope of work of an industrial engineering analysis of far-,n haulage systems in underground retreat coal mining. This study ran concurr
Jan 1, 1975
-
OFR-84(9)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume IX - Water Generator
By C. B. Manula
This report is volume 9 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod
Jan 1, 1975
-
OFR-108-76 Technology Of Auger Mining - Summary - Coal Reserves And Project Independence
Studies of coal reserves have shown that the total augerable reserve base for the United States is estimated to be five billion tons under the current state of mining technology; the potential reserve
Jan 1, 1975
-
OFR-55-77 Remote Sealing Operations - 1. Introduction
By David A. Monaghan
On January 14, 1974 a fire occurred in the 3 East mains of the Joanne Mine of Eastern Associated Coal Corp. in Rachel, West Virginia. The mine was evacuated without injury and sealed completely at the
Jan 1, 1975