Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Groundwater Exploration for Mining Development and Groundwater regimes in the Goldfields of Western Australia
Since gold was first discovered, mining development in the West Australian goldfields has been heavily dependent on the location of groundwater both for potable and mineral processing supplies . Th
Jan 1, 1988
-
Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability
By E Rubio, N Morales
A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the
Sep 26, 2011
-
Community Health Considerations from Mining Executives and Managers in Western Canada
By M Scoble, A Ostry, J Shandro
Mining companies are not ill-informed on the topic of community health. There have been a number of research studies that have illuminated community health issues associated with mining, especially in
Nov 20, 2012
-
Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage
Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ
Jan 1, 2003
-
Heat Load Estimation from Conveyor Systems in Mass Mines
By R Moreby, J Kok, L van den Berg
The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems
Aug 31, 2015
-
A Review ù Pillar Stability Issues at DOZ Block Cave Mine
By D Flint, O Rindriatmoko
PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi
Jan 1, 2005
-
Alternative Underground Ore Transport Systems for the Jaguar Base Metal Deposit
By W P. Darcey
Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s
Mar 21, 2011
-
The Demonstration of Electronic Systems to Assist in the Management of a Significant Incident
By R Moreby
This paper is a demonstration of the techniques developed during an Australian Coal Association Research Program (ACARP) funded research project aimed to develop aids, principally computer based, to a
Jan 1, 2005
-
Real-Time Risk Analysis and Hazard Management
Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar
Jan 1, 2005
-
Spatial Modelling and Optimisation of Geometallurgical Indices
By M J. Newton
As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri
Sep 5, 2011
-
Geochemical Controls on Acid Mine Drainage Generation, Neutralisation Treatment and Attenuation at Iron Duke Mine
By B Manda, K L. Sandvik, K Musiwa
Mining and processing of pyrite ore at Iron Duke Mine, north east of Zimbabwe, generates large quantities of acidic mine water as a result of the oxidation of iron sulfides on exposure to air and wate
Jan 1, 2006
-
Application of foam as a ventilation control for spontaneous combustion management in a longwall goaf
By O Salisbury
Ingress of air into the longwall goaf environment needs to be managed appropriately to reduce the risk of creating a spontaneous combustion event. The maingate goaf edge is an area of particular conce
Oct 12, 2022
-
Developing a best practice framework for inrush risk management
By L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
The Evaluation of the Mining Aspects of Coal Projects
The basic model for the evaluation of any coal-bearing property is the cash flow projection, the major components of which are operating costs, capital charges, taxation and revenue. A range of cash
Jan 1, 1975
-
Design, Commissioning and Operation of Elura's Larox Pressure Filters
By Jagger ND
Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain
Jan 1, 1985
-
The K Deeps Magnetite Mineralisation at Koolyanobbing, Western Australia
By T Angerer, N H. Maund, S Hagemann, D R. Cowan
Cliffs Natural Resources Pty Ltd - Asia Pacific Iron Ore's (formerly Portman Iron Ore Limited) K deposit (Dowd's Hill), at its Koolyanobbing operation in Western Australia, hosts enriched ma
Jan 1, 2009
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia
By C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Wall Control Blasting
By D P. Blair
There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential
Aug 24, 2015
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile Settlements
By D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
Forecast Trends of Australian Mineral Production to the Year 2000
By Huleatt M, Perkin D, McLeod I, Mock C, Pratt R, Gourlay A, Timoney E, Knight N, Ward J
Generally speaking, Australia's reserves of its more important minerals (in terms of export earnings) are adequate to sustain forecast rates of production to the year 2000. The rate of foreca
Jan 1, 1981