    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    Selective Mining Techniques - Telfer

    The Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini

    Jan 1, 1986

  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    Available Defences Against Outbursts in the United Kingdom in 1980

    The paper considers the nature of outbursts of coal and firedamp as they occur. t follows the development of methods of working used to try and induce outbursts safely under controlled conditions a

    Jan 1, 1980

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    El Teniente New Mine Level Project

    By R Pozo, F Reyes

    Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo

    Jan 1, 2008

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    Enhanced fine particle recovery with the Concorde Cell

    By P G. Bourke, A Yáñez, G J. Jameson, N M. L Kupka

    The kinetics of fine and ultrafine particles in conventional mechanical flotation cells are limited (Feng and Aldrich, 1999; Trahar, 1981; Wang et al, 2016). Accordingly, even limited recoveries with

    Aug 24, 2022

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Flotation of Hematite Using C6-C18 Saturated Fatty Acids

    The homologous series of saturated fatty acids investigated in this study generally show a steady gradation of properties with chain length. The solution pKa values were assumed constant at 4.9, howev

    Jan 1, 2005

  • AUSIMM
    Present Practices And Future Trends In World Dry Bulk Handling Operations

    Over a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and

    Jan 1, 1973

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018