Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Practice and Economics of Heap Leaching

    Heap leaching for the recovery of precious metals is a comparatively new and rapidly expanding technology. The practical aspects of heap leaching are described and environmental and economic implicati

    Jan 1, 1984

  • AUSIMM
    Mine Hygiene at the North Mount Lyell Mine

    THE North Mount Lyell Mine is situated on the southern side of Mount Lyell at an altitude of 1750 ft. above sea-level. The average rainfall is 117 in., and there are generally several light falls of s

    Jan 1, 1927

  • AUSIMM
    Filtration of coal washery slurries using a horizontal belt filter

    By Slechta J. J

    An evaluation of a pilot scale Delkor horizontal belt filter at Bellambi's South Bulli Colliery showed high productivities and low moisture contents for a range of feed slurries. When treating fl

    Jan 1, 1986

  • AUSIMM
    The Dissolution of Gold in Cyanide Solutions-An Electrochemical Study

    By Koch D. F A

    An electrochemical study of the dissolution of gold in aerated cyanide solution shows that the dissolution rate is determined by the nature of the surface. A passive film (probably a basic cyanide) fo

    Jan 1, 1964

  • AUSIMM
    On the Mineral Composition of the Mount Oxide Copper Ore, Queensland

    The following brief observations on the mineral composition of the Mt. Oxide copper ore are intended to supplement the geological description of that ore-body recently published by Blanchard (2).&apos

    Jan 1, 1940

  • AUSIMM
    Application of Lithostratigraphic and Chronostratigraphic Analysis to Seam Modelling in the Rapahoe Sector, western Greymouth Coalfield

    Seam correlation in the central Rapahoe Sector (Greymouth Coalfield) can be enhanced by detailed lithostratigraphy and chronostratigraphy. Rewanui Coal Measures are overlain comformably by lacustrine,

    Jan 1, 1996

  • AUSIMM
    Paper No. 175. The Disposal of Residues at Kalgoorlie.

    THE method depends upon:--1. The position of the mill.2. The space available for stacking the residue.3. The nature of the residue as discharged from the mill.4. The value of the residue for re-treatm

    Jan 1, 1909

  • AUSIMM
    The Pre-concentration of Precious and Base Metal Deposits Using the Inline Pressure Jig – Higher Feed Grades and More Metal

    By G J. Delemontex, N J. Grigg

    Pre-concentration of precious metal and base metal ore types is becoming more relevant with the discovery, development and operation of many lower grade deposits around the world. The fluctuations in

    Sep 7, 2015

  • AUSIMM
    Laboratory and Field Tests on Point Anchored Resin Bolts at the Ridgeway Deeps Block Cave

    The design of excavations in high displacement mining environments requires consideration of both the load and displacement capacity of the ground reinforcement and support systems. This paper is a ca

    Nov 25, 2010

  • AUSIMM
    Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ

    Jan 1, 1980

  • AUSIMM
    The Geology of the Chinaman Creek Disseminated Copper Prospect, Near Mount Perry, South-East Queensland

    Copper mineralization associated with minor molybdenum, silver, and gold occurs in a hydrothermally altered brecda within a granodiorite mass of Upper Permian age. A dyke system of rhyolite, dacite, a

    Jan 1, 1972

  • AUSIMM
    The Treatment of the Auriferous Sulphide Ores of Kalgoorlie

    As requested by my fellow members I shall endeavour to read a paper on the Treatment of the Auriferous Sulphide Ores of Kalgoorlie from a metallurgical standpoint. Before going into the subject it wil

    Jan 1, 1901

  • AUSIMM
    The Geology and Metallogeny of Central North Sulawesi

    By N M. Caira

    The North Arm of Sulawesi hosts numerous gold and base metal occurrences. Compilation and analysis of geological, tectonic, geochemical and isotopic age date data collected over the past six years on

    Jan 1, 1999

  • AUSIMM
    Sustainable Carbon in Steel Making - Plant Trials at the Sydney Steel Mill

    OneSteel and BlueScope Steel have been working with the CSIRO to develop sustainable carbon fuels and reductants which are suitable for use in the iron and steel industry. One of the initial focuses o

    Jun 1, 2010

  • AUSIMM
    Raub Gold-Genesis and Recovery

    The Raub Gold Mines are situated approximately in the centre of the Malayan Peninsula in the State of Penang. Part of the area, now known as "Raubhole," was opencut some 800 years ago by the

    Jan 1, 1945

  • AUSIMM
    Stress and Deformation of Mine Openings

    Flat jack stress determinations in selected colliery roadways have revealed a range of measured stress from 330 lb/sq. in. tension to 3,750 lb/sq. in. compression. Photoelastic examination of loaded p

    Jan 1, 1963

  • AUSIMM
    Optimum scale of an open pit operation: discount rate and risk

    For a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a

    Jan 1, 1986

  • AUSIMM
    The Selective Flotation of Xenotime from Heavy Minerals

    By H Hutchinson

    Froth flotation is applied to mineral sand concentrates in order to produce commercially viable xenotime concentrates. Experiments indicate that a xenotime product containing 38% Y2O3 at 47% recovery

    Jan 1, 1990

  • AUSIMM
    Bearing Capacity and Deformation Characteristics of Ponded Fine Grained Coal Mine Tailings

    It is now becoming mandatory in Australia to rehabilitate ponded fine grained coal mine tailings, which may well have been deposited initially with no consideration as to how or whether this could be

    Jan 1, 1987

  • AUSIMM
    Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result

    By J Belke

    Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and

    Jan 1, 2004