Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Social Licence to Operate and Drivers for Change – Resource Reporting and Mine Material Characterisation
By J Heyes, G A. Maddocks, R J. Stewart, G D. Corder
Mining is an international business and vital contributor to national and global economies. It depends on the trust and confidence of investors and stakeholders for its financial and operational well-
Jun 28, 2016
-
Key insights for the successful implementation of proximity detection and collision avoidance technology for reducing vehicle interaction risk – a surface technology provider perspective
By C Hoffmann
Given that each year, 30–40 per cent of mining industry deaths are attributable to failures of vehicle interaction controls (EMESRT, 2023), the mining industry is now armed with a growing body of know
Apr 16, 2024
-
Using novel methods to characterise slag films for continuously casting challenging and innovative steel grades
By X Yang, T Zhang, Z Li, Z Yan, M A. Williams, S Qin, P Wilson
Continuous development of complex new steel grades to meet the ever-increasing demand of high performance causes recurrent issues in steel continuous casting such as surface quality defects (eg cracks
Jun 19, 2024
-
Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept
By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie
"Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass
Jun 15, 2016
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availability
By E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
New Blasting Initiation Technologies in the Mining Industry
Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
The VALMIN Code and Tenure Compliance – Not Just a List
By J Evans-Wheeler
"The mandate of the 2005 VALMIN Code to provide ‘(all) reliable, thorough, understandable material information required by investors and their advisers when making investment decisions’ requires that
Mar 8, 2016
-
Application of three lines model in resource and reserve estimation and reporting
By D Hope, D K. Mukhopadhyay, J D. Harvey
South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang
May 24, 2023
-
Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working face
By S Li, Y Lei, X Wu, C Ma, W Q. Zhang
The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in
Nov 29, 2022
-
Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modelling
By W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings
Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini
Nov 21, 2018
-
A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine
By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr
Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the
Nov 29, 2022
-
Envisioning the rehabilitation of assets through co-design and gamification
By S Grant, S Emeric, P Baker, E Jones, D Clark
As we strive for a sustainable and resilient future, repurposing assets has become a top priority. In Australia alone, we have a significant number of mineral projects in the pipeline, extensive exist
Aug 2, 2023
-
Potential TWA changes for gas monitoring instruments are alarming
By P Aspinall
Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst
Apr 16, 2024
-
Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamation
By G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott
Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav
Aug 2, 2023
-
Energy complexities in complex orebodies
By M Ziemski
The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar
Nov 21, 2018
-
Quantifying iron ore ‘handleability’ to reduce processing plant delays
By P Cherepanskiy, G Elphick, R Hus, C Perring
When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate
Jun 22, 2022
-
Cost Effective Concentrator Design
By G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions
By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations
By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine
The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util
Nov 25, 2010