Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Human Body Posture Sensor for Monitoring and Diagnosing MSD Risk Factors

    By A. Alwasel

    Musculoskeletal disorders (MSDs) threaten the wellbeing and livelihood of a large number of construction workers incurring a significant cost to society. We present a new method to monitor and diagnos

    Aug 1, 2013

  • CIM
    Electrolytic Treatment Of Highly Contaminated Effluents From Copper Smelters

    By S. R. Stopic

    The EU-financed INTREAT Project (Integrated treatment of industrial wastes to¬wards prevention of regional water resources contamination) addresses the environmental pollution associated with solid an

    Jan 1, 2007

  • CIM
    Mine Closure and Exit Strategies. Risk Financing Solutions for Environmental Liabilities and Sustainability

    By Paul T. Fitzgerald

    Risk financing solutions are emerging to fully address environmental liabilities for mining operations. Supported by specialized insurance and alternative risk transfer (ART) products, mine owners can

    Apr 1, 2005

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015

  • CIM
    Coal Mountain Operations: The next twenty years

    By B. R. Johnston, K. D. Streeter

    "ABSTRACTCoal Mountain Operations is the newest of Fording Coal’s operations although it is the oldest in terms of its historical production. In October, 1994, Fording purchased the former Corbin Cree

    Jan 1, 1997

  • CIM
    Gold(I) as a Nucleophile - a Base

    By Jr. Fackler

    The ionization potentials of gaseous Group 11elements are similar, with Au(0) being 1.5 eV greater than the next highest member of the group, Cu(0). The ionization potentials are all very much greater

    Oct 1, 2003

  • CIM
    Fractography Results for Fatigue Coupon Testing of Clad and Unclad 2024-T3 Aluminum Alloys

    By L. Gasser, N. Bellinger, H. Awatta, A. Merati

    As aircraft age, the extent of interactions between fatigue and other damage mechanisms, such as corrosion and fretting, increases. At present, however, there is no generally accepted methodology with

    Jan 1, 2006

  • CIM
    Applicability of Near-Infrared Hyperspectral Imagery (NIR-HI) For Sensor Based Sorting of an Epithermal AU-AG Ore

    By F. J. A. van Ruitenbeek, M. Dalm

    In the presented study test work was performed with near-infrared hyperspectral imagery (NIR-HI) on 36 ore samples from a South-American epithermal Au-Ag mine. The aim of the test work was to investig

    Jan 1, 2015

  • CIM
    Simultaneous measurement of mine worker exposure to respirable silica and diesel exhaust particulates

    By M. Gangal, M. Grenier, D. Mchaina, S. Hardcastle

    "Exposure to airborne respirable silica in surface and underground mine operations is known to be the cause of industrial lung diseases. For this reason, silica is a regulated substance and worker exp

    Jan 1, 1992

  • CIM
    Diamond and Drilling Technology Mineral Exploration

    By G. H. Charlewood, J. W. McBean

    "One hundred years after being developed, the diamond drill is still an essential tool in mineral exploration. The basic principle is unchanged, but the technique has been revolutionized, particularly

    Jan 1, 1967

  • CIM
    Distribution and Solubility of Platinum Group Metals in Slags

    By K. Yamaguchi

    "This Precious metals content copper scrap is treated with a copper smelting process, and copper and precious metals are recovered. The precious metal lost in the slag is increasing with increasing of

    Jan 1, 2012

  • CIM
    Crack in Corrosion (CIC) Failure in APL-5l X 52 Thin-Walled Linepipe

    By D. Cronin, A. Plumtree, A. Hosseini

    "Crack in corrosion (CIC) linepipe defects are hybrid defects not directly addressed by existing assessment methods. To investigate the collapse pressure of these defects, CIC defects were formed in 5

    Jan 1, 2012

  • CIM
    Clayburn-Harbison Limited Operations in British Columbia

    By R. H. Beaton

    "About 1905, a plant was constructed at C1ayburn, in the Lower Fraser valley, 4'5 miles east of Vancouver, to process shales from Sumas mountain into heavy clay products. In time, mining operations we

    Jan 1, 1959

  • CIM
    The Hydrometallurgical Production of Cobalt

    By W. Kunda, J P. Warner

    SHERRITT GORDON Mines Limited annually produce 300,-000 pounds of pure cobalt by processing a nickel-cobalt-copper-iron sulphide ore which is mined at Lynn Lake, Manitoba. The ore (containing 0.04 per

    Jan 1, 1962

  • CIM
    Analysis of Hydrogen-Based Pore Distribution in A356 and B206 Aluminum Alloys

    By D. M. Maijer, S. L. Cockcroft, S. Modak, A. B. Phillion

    "A comparison between hydrogen-diffusion-based micro-porosity formation and growth behaviour of two important aluminium foundry alloys, B206 (Al-Cu) and A356 (Al-Si-Mg) is presented in this paper. Spe

    Jan 1, 2017

  • CIM
    Möqssbauer Spectroscopy for Quantification of Pyrrhotite in Pyrrhotite/Pentlandite Mixtures Related to Self-Heating

    By D. H. Ryan, J. T. Graham, A. Navarra, J. A. Finch, S. Somot

    Pyrrhotite (Po) is widely considered to be the most significant mineral in the self-heating of sulphides. It is therefore desirable to determine the amount of Po in mineral samples. This is commonly a

    Jan 1, 2009

  • CIM
    An up and Downscaling Scheme for Multi-Scale Poroelastic Simulation in Laterally Drained, Layered Formations

    By J. Ita, F. Malekzadeh

    "Multi-scale simulation in coupled fluid flow- geomechanical systems is a computationally efficient method for numerically solving large poroelastic systems. When using multi-scale methods, care must

    Jan 1, 2015

  • CIM
    A Thermo-Chemical Model of the Peirce - Smith Copper Converter: Part I. Slag Making Stage

    By M. Aushouri, S. H. Mansouri, N. Aminizadeh

    A thermo-chemical model of the Peirce-Smith copper converter has been developed to predict the molten temperature. The primary assumption of the model was that all matte, slag and gaseous phases in th

    Jan 1, 2007

  • CIM
    Cu – Ni Concentration Gradient Alloy for Antimicrobial Efficacy Testing

    By H. A. Khorami, T. Wong, B. Velapatino, E. Asselin, T. Donnelly, E. Bryce, R. Dixon

    A copper–nickel concentration gradient alloy was designed and fabricated through a powder metallurgy (PM) process. Copper and nickel powders were mixed with different weight ratios from 0 to 100% copp

    Jan 1, 2019

  • CIM
    Computer Control of Flotation at the Ecstall Concentrator

    By C. Chapman, M. G. Reading, M. P. Amsden

    Ecstall Mining Limited, a subsidiary of Texasgulf Incorporated, operates the Kidd Creek mine, a 10,000- tpd base metal producer, near Timmins, Ontario. Two different ore types are mined and milled cop

    Jan 1, 1973